-
Northwest mining three main units to consolidate the basic plate for stable production
Time of Update: 2021-08-22
While actively adjusting the flow trend of well groups, technicians adjusted and governed large units in time based on actual changes in production, and gradually formed the "1416" high-yield well management model, the construction of a three-dimensional well pattern technology for tapping remaining oil, and geological engineering integrated plugging.
-
Yangzi Petrochemical Quality Inspection Center LES system goes online
Time of Update: 2021-08-22
Sinopec News Network News In early July, Yangzi Petrochemical Quality Inspection Center officially launched the LES laboratory execution system, which realized the function of collecting original analysis process data by information methods, and improved and standardized the authenticity, integrity and plasticity of laboratory analysis data.
-
Zhongyuan Petrochemical "Electric Instrument Training Base, Expert Studio" Unveiled
Time of Update: 2021-08-22
Sinopec News Network News On June 29, Zhongyuan Petrochemical held the inauguration ceremony of "Electric Instrument Training Base and Expert Studio", and the company's main leaders jointly unveiled .
The main leaders of the company jointly unveiled the electric instrument training base and expert studio, and visited them.
-
Jianghan Salt Chemical's foreign trade sales increased by 24% year-on-year
Time of Update: 2021-08-22
This year, Jianghan Salt Chemical Industry of Jianghan Oilfield has turned crises into opportunities and made breakthroughs in the export and sales of disinfectant products such as bleaching powder and strong chlorine, overcoming logistics and shipping difficulties, fully tapping existing sales channels, improving sales and service systems, and carefully Cultivate customer loyalty, sign annual framework agreements with old customers, lock the market in advance, and expand overseas market share .
-
Gudong Oil Production Plant strictly manages contractors and builds safety shortcomings
Time of Update: 2021-08-22
During the period of "two specials and two important", the oil production plant business departments and three-level units earnestly implemented the "who is in charge, who is in charge" and "territorial management" responsibilities, strengthened the safety training and education of contractors, and implemented the confirmation and upgrade of safety conditions before the start of construction.
-
The polymer flooding technology of Zhongyuan Oilfield has achieved remarkable results
Time of Update: 2021-08-22
Since the establishment of the project, the research personnel of the Petroleum Engineering Technology Research Institute have carried out detailed research on the high-salt characteristics of the Zhongyuan Oilfield, and developed a temperature-resistant and salt-resistant polymer composite system whose thermal stability is 30% higher than that of conventional polymers.
-
Qilu Petrochemical Olefins Plant Shen first-level management to ensure safety
Time of Update: 2021-08-22
Two-level promotion to eliminate the "blockers" of safety management "Is the recent production fluctuations equipment problems or personnel operation problems?
-
Successful completion of the first autonomous daily exploratory well in North China Oil & Gas
Time of Update: 2021-08-22
As a key project in the oil and gas and new energy sector of the group company, the new 602 well daily fee system pilot is an important exploration of the market-oriented operation of the daily fee drilling contracting model, and also an important attempt for the company's efficient exploration technology requirements and exploratory well management mode .
-
Shengli Oilfield's enhanced film-forming and sand control technology is leading internationally
Time of Update: 2021-08-21
Foreign prices are expensive and restrict our country Sand control and increased injection technology are important technical guarantees for the benefit and stable production of oilfields.
-
The first sour gas well in western Sichuan sets a new record
Time of Update: 2021-08-21
The technical tracking team of the brigade closely monitors various production parameters, and through continuous summary and practical understanding of the complex iron desulfurization process, it has formed a set of dynamic optimization technology for chemical indicators, and compiled the "Chuanke 1 Well Experience Operation Manual" and a typical case library.
-
Jiangsu Oilfield No. 1 Oil Production Plant achieved more than half of its production and operation ahead of schedule
Time of Update: 2021-08-21
Since the beginning of this year, this factory has focused on the new development pattern of the oilfields "two-gathering strategy", "three-step vision", and "four increases and four liters", aiming at an annual output of 620,000 tons of oil and gas equivalent, and inheriting the red genes through party history learning and education.
-
Baling Petrochemical introduces "Shuiyunzong" to improve quality and benefit
Time of Update: 2021-08-17
In production, the free chlorine index is abnormal, which is not conducive to the control of microorganisms in the water, directly affecting the water quality qualification rate and water treatment effect, and threatening the stable operation of the water cooler of the main unit .
-
The first hoisting of Hainan Refining & Chemical Hydrocracking Unit equipment was completed
Time of Update: 2021-08-17
6 million tons/year hydrocracking unit of the Hainan Refining and Chemical Project undertaken by the Fourth Construction Company realized the first large-scale equipment hoisting and installation in the refining area .
-
Anqing Petrochemical Storage and Transportation Department Strengthens Management Staff Training
Time of Update: 2021-08-17
Combining the work characteristics of the Storage and Transportation Department, this lecture organized different professionals to participate in the training, breaking professional barriers, and strengthening the inter-professional relationship, aiming to improve the safety production knowledge of all technical personnel and strengthen safety production supervision and management .
-
Zhong'an United Coal Chemical Project successfully passed the completion acceptance
Time of Update: 2021-08-17
7 million tons/year methanol conversion olefin project of Zhong'an United Coal-to-Owner won the China Petrochemical Corporation Quality Engineering Award.
7 million tons/year methanol conversion olefins project successfully passed the completion acceptance, marking the realization of another major milestone in the history of the joint development and construction of Zhongan, laying a solid foundation for the high-quality development of Zhongan joint .
-
Ten construction of Weifang polypropylene project steel structure in full swing
Time of Update: 2021-08-17
. Since the start of construction, the Weifang Project Department of Ten Construction has optimized and improved the steel structure construction organization plan in advance, actively communicated and coordinated with the owner, design and other units, fully implemented the high-end polypropylene project steel structure installation drawings and materials in place, and ensured the professional construction of steel structures Expand on time .
-
North China Institute of Engineering strengthens emergency skills and lays a solid foundation for safety
Time of Update: 2021-08-17
Organized a total of 12 teams of functional departments, business offices, and experimental centers of the Academy of Engineering, and more than 90 people carried out emergency skills competitions in 5 projects including emergency rescue, escape rope knots, relay fire fighting, cardiopulmonary resuscitation, and award-winning question and answer .
-
Successful completion of drilling construction tasks in western North China
Time of Update: 2021-08-17
It marked the first horizontal section of the North China Oil and Gas Branch with a "twist-increased-twist" bow-shaped non-guide hole horizontal well, which successfully completed the drilling task .
-
The first set of mixed hydrocarbon rectification desulfurization unit in Northwest Oilfield was put into operation
Time of Update: 2021-08-17
To this end, the Petroleum Engineering Technology Research Institute of Northwest Oilfield Branch carried out technical research, using the idea of physical desulfurization, using the principle of rectification and gas-liquid equilibrium, and based on the boiling points and relative volatilization of hydrogen sulfide, part of organic sulfur and various components in mixed hydrocarbons.
-
Victory Technical Inspection Center promotes the carbon neutral process with five carbons
Time of Update: 2021-08-17
According to China Petrochemical News Network, the Party Committee of Shengli Oilfield Technology Testing Center, in accordance with the new requirements and new goals of high-quality transformation