-
Categories
-
Pharmaceutical Intermediates
-
Active Pharmaceutical Ingredients
-
Food Additives
- Industrial Coatings
- Agrochemicals
- Dyes and Pigments
- Surfactant
- Flavors and Fragrances
- Chemical Reagents
- Catalyst and Auxiliary
- Natural Products
- Inorganic Chemistry
-
Organic Chemistry
-
Biochemical Engineering
- Analytical Chemistry
-
Cosmetic Ingredient
- Water Treatment Chemical
-
Pharmaceutical Intermediates
Promotion
ECHEMI Mall
Wholesale
Weekly Price
Exhibition
News
-
Trade Service
Sinopec News Network reported on July 3 that the construction of the 300,000-ton/year high-end polypropylene project in Weifang, Shandong, undertaken by the No.
10 Construction Company of Refining and Chemical Engineering Co.
, Ltd.
began to install, marking the full launch of the steel structure of the project
.
It is understood that the total steel structure installation of the high-end polypropylene project in Shandong Weifang reaches more than 3,000 tons, which is one of the key lines for the entire project construction.
It is faced with many unfavorable factors such as tight construction period, high safety risk, and small construction work space.
.
Since the start of construction, the Weifang Project Department of Ten Construction has optimized and improved the steel structure construction organization plan in advance, actively communicated and coordinated with the owner, design and other units, fully implemented the high-end polypropylene project steel structure installation drawings and materials in place, and ensured the professional construction of steel structures Expand on time
Facing the relatively severe safety control situation in the construction of steel structures, the project department took precautions and carried out safety emergency drills in advance to prevent falling from heights, hitting heavy objects, temporary electricity use, and lifting and hoisting, effectively improving the safety management and control capabilities of construction employees
.
The project department attaches great importance to the safety disclosure of steel structure construction technology.
Before the construction of the steel structure began, the staff involved in the project department overcame the continuous heavy rainfall in Weifang since June and took various measures to speed up the professional construction process of civil concrete pouring, steel bar bundling, underground pipe network, ground hardening, etc.
(Tian Yuanwu)