-
Changling Refinery optimizes process operation to reduce steam consumption
Time of Update: 2021-08-28
In July, the steam consumption of production equipment such as catalysis was close to the lowest level in history, which greatly reduced the operating cost of the equipment and promoted the improvement of overall efficiency .
-
Jinling Petrochemical fights the "war of supply guarantee" for boiler overhaul in autumn
Time of Update: 2021-08-28
It was learned on site that the cable trough box and frame materials need to be prefabricated in advance, but encountered the problem of not meeting the requirements according to the normal delivery time, the purchaser immediately communicated and coordinated with the supplier to arrange a special logistics car for delivery, and the 5 specifications of 490m cable troughs The boxes were delivered to the scene 7 days in advance .
-
The first well of Qingxi Gas Storage in Zhongyuan Oilfield was successfully drilled
Time of Update: 2021-08-28
Serious and other unfavorable factors, strengthen the stratum comparison and tracking research in actual drilling, timely adjust the trajectory and quasi-stratum level, accurately predict the location of the target gas layer, and ensure safe and efficient construction .
-
Anqing Petrochemical Transportation Department uses actions to protect the clearness of the eight hundred miles of Wanjiang River
Time of Update: 2021-08-28
In order to protect the water resources of the Mother River, the Yangtze River and reduce the pollution of coal dust to the water supply source, in accordance with the requirements of the Yangtze River's environmental management, the Anqing Petrochemical Transportation Department has built a barge initial rainwater collection facility, set up a cofferdam around the barge, and unloaded the ship in the catenary bucket of the waterway barge.
-
Maoming Petrochemical's ethylene output hits a new high in a single day in summer
Time of Update: 2021-08-28
2 cracker, formulated optimization measures, tracked the operation status of the adjusted system, analyzed the main problems affecting production on the day, and arranged to increase ethylene on the same day.
-
Guangzhou Petrochemical put into use ice machine to solve problems, increase load and reduce energy consumption
Time of Update: 2021-08-28
China Petrochemical News Network reported recently that an ethylene spherical tank ice machine was put into use in an olefin area of Guangzhou Petrochemical Chemical, which not only increased the feed rate of the device, but also reduced the high energy consumption of the device by 1.
-
Jinling Petrochemical strictly controls autumn air quality
Time of Update: 2021-08-28
The company's alkylbenzene plant strictly controls the emission indicators of the pollution factor of the heating furnace, continues to carry out the investigation and treatment of VOCs leakage, and implements environmentally friendly production .
-
Maoming Petrochemical's first set of steam pressure matching device was put into operation
Time of Update: 2021-08-28
The professional technical backbone of the thermoelectric division took the lead in tackling the problem, and proposed to add a steam pressure matcher to the boiler installation to increase the amount of surplus low-pressure steam, avoid low-pressure steam venting, reduce high and reduce steam waste, increase steam turbine power generation, and further reduce CFB boiler installations Energy consumption, to achieve the effect of energy saving and consumption reduction .
-
Anqing Petrochemical's gasoline online blending technology has made a breakthrough
Time of Update: 2021-08-28
Beginning in August 2020, Anqing Petrochemical's production planning department, quality control center, and storage and transportation department have organized optimization and coordination technology research .
In April of this year, online optimization and reconciliation were successful .
-
North China Petroleum Engineering integrates green environmental protection into corporate development in an all-round way
Time of Update: 2021-08-28
While helping the local economic development, it vigorously promoted waste sorting, oil-to-electric power conversion, use of mud, and environmentally friendly toilets.
“Now using gas as a power source, the well site is quiet, smoke and dust disappear, and there is no waste oil, which not only protects the environment, but also saves costs .
-
Maoming Petrochemical Port's chemical product pipeline transportation volume doubled year-on-year
Time of Update: 2021-08-28
The long-distance pipeline system of Maoming Petrochemical Port's chemical products is composed of 5 23.
Optimized projects above the level of 788 million yuan .
-
Southwest Oil and Gas Pilot Project Helps Intelligent Gas Well Drainage and Production
Time of Update: 2021-08-28
The pilot test project undertaken by the Southwest Oil and Gas Engineering Institute took tight sandstone gas reservoirs in western Sichuan as the research object, and developed a multi-parameter online acquisition platform for gas wells, and developed a full-period gas field exhaust gas field.
-
Fujian United Petrochemical Waste Acid Regeneration Unit was successfully started up
Time of Update: 2021-08-28
At present, the employees participating in the construction of the ten construction company are closely cooperating with the personnel of the owner's workshop of Fujian United Petrochemical to do a good job of tracking and guaranteeing the project to ensure the safe, high-quality and smooth operation of the waste acid regeneration device .
-
The Puguang Gas Field's "increased revenue rate and benefit" special competition has achieved remarkable results
Time of Update: 2021-08-28
Facing the current situation of declining oil pressure in gas wells and declining production capacity, Puguang Gas Field launched a special competition of “increasing yield and increasing efficiency”.
In the second quarter, the recovery rate of purified gas increased by 0.
-
The first ship of Jiujiang Petrochemical Co., Ltd. successfully leaves the factory
Time of Update: 2021-08-28
All open up, adding an important delivery route for the company's topping oil to leave the factory, ensuring a smooth road after the carbon 5 leaves the factory .
-
The application of fracturing technology in North China adds another high-yield well to Jin 30 well area
Time of Update: 2021-08-28
Recently, the J30P5H well of Dongsheng Gas Field of North China Oil and Gas Company integrated the dense cutting multi-cluster and mixed water fracturing technology.
-
Qilu Petrochemical's low-sulfur heavy-duty ship fires a new high
Time of Update: 2021-08-28
China Petrochemical News Network reported that in July, Qilu Petrochemical’s planning and operation department, refinery, sales, storage and transportation department actively coordinated fuel oil companies and other relevant units to overcome the impact of adverse factors such as high temperature and thunderstorms, and increase transportation.
-
Well D1-559 in Daniudi Gas Field in North China achieved high production
Time of Update: 2021-08-28
The high production of Well D1-559 represents the gradual maturity of the acid fracturing technology for alternating high and low viscosity acid injection in North China, which strengthens confidence in the efficient development of lower paleocarbonate gas reservoirs in the Daniudi Gas Field .
-
Changling Refining and Petroleum Refining No. 1 to achieve the establishment of a three-base model
Time of Update: 2021-08-28
China Petrochemical News Network reported in recent years, Changling Refining & Chemical Refining Division 1 has been planning according to the "three bases" model work, focusing on the safety of equipment production, strengthening KPI indicator management, focusing on consolidating grassroots construction, refining basic work, and Strengthening the three aspects of basic skills training and steadily advancing the creation of the "three bases" model, which has achieved more obvious results .
-
Three-year treatment of Tahe 4th District in Northwest Oilfield to triple daily crude oil production
Time of Update: 2021-08-28
27 million tons of reserves in the middle and deep parts were out of control Three years ago, Wang Jiale, director of the Development Research Institute of the First Oil Production Plant, was very anxious about the development status of Tahe Four District: "The conventional water and gas injection methods have been exhausted, and the daily output of the block is still hovering at 220 tons .