echemi logo
Product
  • Product
  • Supplier
  • Inquiry
    Home > Chemicals Industry > Petrochemical News > The application of fracturing technology in North China adds another high-yield well to Jin 30 well area

    The application of fracturing technology in North China adds another high-yield well to Jin 30 well area

    • Last Update: 2021-08-28
    • Source: Internet
    • Author: User
    Search more information of high quality chemicals, good prices and reliable suppliers, visit www.echemi.com

    Recently, the J30P5H well of Dongsheng Gas Field of North China Oil and Gas Company integrated the dense cutting multi-cluster and mixed water fracturing technology.
    The supporting temporary plugging technology was successfully completed.
    The gas was seen 2 days after the pressure, and the gas was tested in the station.
    6.
    0 MPa, gas production is 59,000 cubic days per day
    .

    This well is an appraisal horizontal well in the south of No.
    8 channel of He 1 gas reservoir in Jin 30 well block of Dongsheng gas field.
    The reservoir has strong heterogeneity.
    It is designed to fully utilize sweet spots and maximize the production capacity of the reservoir.
    Staged fracturing design ideas, and supporting inter-segment soluble ball temporary plugging technology, to ensure multi-cluster balanced transformation; at the same time, in view of the characteristics of the common development of micro-fractures in the Jin 30 well area, the mixed water volume fracturing design idea is adopted, and the pre-fluid is adopted Create low-viscosity fractures, communicate with natural fractures as much as possible, increase fracture-controlled reserves, and use high-viscosity fracturing fluid to carry sand to improve the conductivity of the main fracture
    .

    In 2021, 3 wells in the Jin 30 well area have adopted this technology to obtain high production, which further confirms the adaptability of the integrated application of dense cutting, multi-cluster and mixed water volume fracturing technology in the Jin 30 well area, which is also a follow-up to this area.
    The foundation is laid for effective development
    .


    (Li Yangyang)

    This article is an English version of an article which is originally in the Chinese language on echemi.com and is provided for information purposes only. This website makes no representation or warranty of any kind, either expressed or implied, as to the accuracy, completeness ownership or reliability of the article or any translations thereof. If you have any concerns or complaints relating to the article, please send an email, providing a detailed description of the concern or complaint, to service@echemi.com. A staff member will contact you within 5 working days. Once verified, infringing content will be removed immediately.

    Contact Us

    The source of this page with content of products and services is from Internet, which doesn't represent ECHEMI's opinion. If you have any queries, please write to service@echemi.com. It will be replied within 5 days.

    Moreover, if you find any instances of plagiarism from the page, please send email to service@echemi.com with relevant evidence.