-
Categories
-
Pharmaceutical Intermediates
-
Active Pharmaceutical Ingredients
-
Food Additives
- Industrial Coatings
- Agrochemicals
- Dyes and Pigments
- Surfactant
- Flavors and Fragrances
- Chemical Reagents
- Catalyst and Auxiliary
- Natural Products
- Inorganic Chemistry
-
Organic Chemistry
-
Biochemical Engineering
- Analytical Chemistry
-
Cosmetic Ingredient
- Water Treatment Chemical
-
Pharmaceutical Intermediates
Promotion
ECHEMI Mall
Wholesale
Weekly Price
Exhibition
News
-
Trade Service
China Petrochemical News Network reported that in August, Jinling Petrochemical Thermal Power No.
2 boiler was overhauled, and more than 800 materials were submitted
.
It is very important to ensure timely and safe supply .
Grasp the supply of key equipment
.
The key long-term project of the company's thermoelectric No.
On-site docking to solve difficult problems
.
Relevant procurement personnel participate in the on-site overhaul coordination meeting every Tuesday and Thursday morning, docking with the operation department, construction and other units of the arrival time of various materials, and fully grasping the material requirements of each construction progress
Purchasing and logistics are both hands-on
.
In July, the new crown epidemic occurred in Nanjing, Yangzhou and other places, and the guarantee of some materials was greatly affected, and it was difficult for logistics vehicles to enter the factory