-
East China Project broke the record of the construction area and won the letter of thanks from Party A
Time of Update: 2021-07-14
Recently, the 30661 team of the Sichuan Project Department of East China Engineering successfully completed the construction task of YS149 well, and once again broke the record for the fastest drilling cycle of 215.
49 days, and the team maintained the fastest drilling cycle of 215.
-
Shengli mud logging uses "X-ray" technology to check the quasi horizon
Time of Update: 2021-07-14
Sinopec News Network reported on April 6th that the SL233 logging team of Sinopec Jingwei Shengli Geological Logging Company used element logging technology to accurately capture the completion depth of the three-way completion under the condition that the target formation of Shunbei 9X well was 135 meters ahead of the design .
-
Build a world-class enterprise with global competitiveness
Time of Update: 2021-07-14
Anchor target task The important direction of enterprise development The new energy security strategy of "Four Revolutions, One Cooperation" proposed by General Secretary Xi Jinping and the goals of carbon peaking and carbon neutrality are of great significance to the promotion of high-quality energy development in the new stage and are the fundamental principles for us to do a good job in energy work.
-
The first application of zipper fracturing technology in North China wells to double the efficiency
Time of Update: 2021-07-14
The company used zipper fracturing technology for the first time in the construction of the JPH-480/481 well group in the Hangjinqi block of the Second Gas Production Plant of North China Oil and Gas Branch.
-
Energy and environmental protection policies need to be transformed
Time of Update: 2021-07-14
In 2020, General Secretary Xi Jinping made two promises at the UN General Assembly: First, before 2030, China will reach the peak of carbon emissions in advance on the basis of the Paris commitments; second, China proposes an end point plan, that is, China will achieve it by 2060.
-
Qilu Petrochemical's self-sold products enter the Sinopec e-commerce platform
Time of Update: 2021-07-13
In 2020, the annual work meeting of the group company called for the creation of a unified petrochemical product e-commerce platform within the Sinopec system, and proposed to vigorously develop a new economy, innovate business models, and tap new profit growth points.
-
Tahe Refinery continues to promote a 100-day safety and accident-free special action
Time of Update: 2021-07-13
In order to achieve DCS optimization management, the 2# hydrogen refueling unit formulated the "DCS Keyboard Operation Management Regulations", strictly regulated the adjustment of the keyboard size and arrow, and conducted training and examinations for internal operations and team leaders.
-
Luoyang Petrochemical lays a solid foundation for quality and builds a solid foundation for development
Time of Update: 2021-07-13
China Petrochemical News Network News In recent years, Luoyang Petrochemical has focused on annual goals and tasks, focusing on improving quality and efficiency, continuously improving its quality ma
-
Chuanwei Chemical's liquid ethylene pipeline upgrade project was successfully completed
Time of Update: 2021-07-13
Sinopec News Network reported recently that the liquid ethylene transfer pump import and export connection hidden danger management project of the Chuanwei Chemical Emulsion Operation Department was
-
Beihai Refining & Chemicals helps to create the charm of Beihai "green business card"
Time of Update: 2021-07-13
This year is Beihai City’s second national water-saving city review assessment since it was awarded the “National Water-saving City” on May 12, 2013.
747800 Tons, 436,900 tons of rainwater is reused every year on average.
Rainwater and sewage reuse totaled 1.
-
Sijian Lifting Company completed the lifting of large-scale Bora equipment efficiently
Time of Update: 2021-07-12
Recently, the Fourth Construction Hoisting Transportation Company efficiently completed the large-scale equipment hoisting task of the Bora Petrochemical Project, which won high praise from the owners and relevant departments.
-
Zhongke Refinery achieves a good start to production and operation in the first quarter
Time of Update: 2021-07-12
China Petroleum & Chemical Corporation News Network News Since this year, Zhongke Refining & Chemical has benchmarked the advanced indicators of the group company, leveraged the advantages of a new integrated refining and chemical enterprise, worked hard on smooth operation and optimized production, and achieved a good start for the first quarter of production and operation.
-
All units of the Fifth Construction Company steadily carried out the theme activities of Quality Day
Time of Update: 2021-07-12
During the event, all units and project departments of the Fifth Construction Company held a quality day mobilization meeting to carefully study the "Guiding Opinions of the CPC Central Committee and the State Council on Carrying out Quality Improvement Actions", "Sinopec's 2021 Quality Work Points", Refining & Chemical Engineering Group and the No.
-
Central and local heavy warehouse layout of new energy tens of trillions of market to be opened
Time of Update: 2021-07-12
Industry insiders believe that the "14th Five-Year Plan" is expected to become an important window for the development of hydrogen energy, but the cost, technology and other pain points need to be solved.
-
Construction of the first clean energy artery leading directly to Xiong'an started
Time of Update: 2021-07-12
Economic Daily, Beijing, April 12 (Reporter Bao Yuanyuan) The reporter learned from the National Pipeline Network Group that my country’s first clean energy "large artery" that directly connects to the Xiongan New Area-the National Pipeline Network Mengxi Coal-to-Natural Gas Export Pipeline ( The first phase of the project started on April 13th.
-
Hainan's domestic and foreign trade policy for refueling without tax on the same ship has been implemented
Time of Update: 2021-07-12
This is the first ship bunkering business implemented since the "Notice on the Policy of Bonded Oil and Locally Produced Fuel Oil for Domestic Ships Transported on the Same Ship in Hainan Free Trade Port Domestic and Foreign Trade" (hereinafter referred to as the "Notice") jointly issued by the five national ministries and commissions.
-
Shijian Maoming Project actively carried out "Quality Day" activities
Time of Update: 2021-07-12
The launch of this activity further improved employees’ quality awareness, strengthened bottom-line thinking, strengthened strict management, in-depth search for hidden quality hazards and weak links in quality management in the current construction, and continued to improve and improve the level of project quality management, laying a foundation for building a high-quality project Solid foundation.
-
Shengli Zhuangxi Operation Area: Technological research to create green operations
Time of Update: 2021-07-12
During the construction process of sand flushing and drilling plug in oil and water wells, it is necessary to clean out the formation sand and mortar deposited in the large tank in time to prevent the formation sand and mortar from entering the wellbore again.
-
Yi Baolian: Vigorously develop hydrogen energy to help achieve carbon peak and carbon neutrality
Time of Update: 2021-07-12
Original title: Yi Baolian, Academician of the Chinese Academy of Engineering: Vigorously develop hydrogen energy to help achieve carbon peak and carbon neutrality People's Daily Online, Beijing, April 12 (Reporter Du Yanfei) "China’s energy structure is “poor oil, less gas, rich in coal”, no matter from the background of carbon peaking and carbon neutrality, or from ensuring national energy security and reducing the need for fossil fuels.
-
Guizhou oil production and marketing linkage promotes natural gas operations
Time of Update: 2021-07-12
Procurement and sales teamed up to make full use of the price difference and seize direct distribution and retail LNG heavy truck customers.