-
High-capacity production of high-flow resin pellets by Sinopec
Time of Update: 2022-10-16
It not only breaks the technical bottleneck of the high-load device's independent production of high-flow resin products, but also provides new impetus for the diversified development of localized technologies On May 10, Zhongsha (Tianjin) Petrochemical successfully produced low-density polyethylene M500026T high-flow resin pellets, becoming the first and only domestic company to produce this product in a polyethylene plant with a scale of more than 300,000 tons per year.
-
Sino-Korea petrochemical resin products' heavy film thinning has reached the domestic advanced level
Time of Update: 2022-10-16
While improving the operating efficiency of the packaging line, it can reduce logistics and packaging costs According to estimates, after the company switched to 120-micron heavy film, the efficiency of each 10,000 tons of products can be increased by tens of thousands of yuan, and the use of 7 tons of heavy film can be reduced.
-
Tianyuan Co., Ltd.: the company's current production and sales of chlorinated titanium dioxide are good and the price is on the market
Time of Update: 2022-10-16
, Ltd. with an annual output of 50,000 tons of chlorinated titanium dioxide has entered normal production operation As we all know, in December last year, the expansion project of Tianyuan Co.
-
Guangdong Petrochemical's 500,000 tons/year polypropylene plant was successfully delivered
Time of Update: 2022-10-16
action The Guangdong Petrochemical Refining and Chemical Integration Project is an important role for China National Petroleum Corporation to implement the national energy security strategy, utilize "two resources" and "two markets", establish an integrated international cooperation model for upstream, midstream and downstream, and build a comprehensive international energy and oil company.
-
Jinan Shengquan expands production and speeds up Zhuhai Phase II special epoxy resin project to be put into production next year
Time of Update: 2022-10-16
After the company's 230,000-ton phenolic resin project is completed and put into production, the annual production capacity will reach 670,000 tons, making it the world's largest phenolic resin manufacturer At the performance meeting, Shengquan Group stated that the company's current production and operation conditions are normal.
-
Why do degradable plastic bags choose PLA and PBAT as raw materials?
Time of Update: 2022-10-16
. However, the high price of this material limits its application in the market; therefore, its inexpensive and degradable starch blended with PBAT is a good choice .
-
The total investment is 10.69 billion!
Time of Update: 2022-10-16
industry status in the field The announcement shows that the capital increase will be invested in the 600,000 tons/year ABS and its supporting equipment project of Baolai New Materials.
-
Cangzhou Refinery Increases Environmental Protection Governance to Promote Green and Low-Carbon Development
Time of Update: 2022-10-16
In the past five years, a total of 420 million yuan has been invested to implement 46 environmental protection projects such as the construction of a new 20,000-ton/year sulfur plant, and the upgrading and transformation of sewage discharge to meet standards Cangzhou Refinery insists on integrating ecological protection into enterprise development, and continues to increase investment in environmental protection.
-
Two production safety accidents occurred in an industrial park in Ningxia in one day, resulting in 4 deaths
Time of Update: 2022-10-15
The work area must be cleaned, replaced, and analyzed to be qualified, the work ticket is approved, and personal protective equipment can be properly worn before entering The notification requires that before operations in confined spaces and hot work, regulations such as material cutting and energy isolation must be strictly implemented.
-
China's largest LNG storage tank pressure lift successfully
Time of Update: 2022-10-15
On May 17, the pressure-lifting operation of the 270,000-cubic-meter large-scale LNG storage tank at Sinopec Qingdao Liquefied Natural Gas (LNG) Terminal was successfully completed, and the construction of the main structure of the outer tank was basically completed .
-
China Federation of Logistics and Purchasing: The total amount of industrial product logistics in April fell by 2.9% year-on-year
Time of Update: 2022-10-15
Among them, the logistics of new material products such as solar cells continued to maintain a high-speed growth trend, with a growth rate of more than 20%; the manufacturing industry of computers, communications and other electronic equipment increased by about 5%, and the resilience of new kinetic energy is still strong .
-
International oil prices closed up slightly, and raw materials such as butyl acrylate and propylene oxide fell slowly!
Time of Update: 2022-10-15
In addition to the objective factors such as the rise of raw materials, what other factors are affecting it?It is worth noting that this is already the third round of price hikes in the year for leading titanium dioxide companies .
-
Nippon Paint "speeds up"! The Quanzhou project with an annual output value of 2 billion yuan will be put into production next month
Time of Update: 2022-10-15
After the project is fully completed and put into operation, the annual output value is expected to achieve 2 billion yuan The first phase of Nippon New Materials' production base project in the West Coast Economic Zone of the Taiwan Strait has entered the final commissioning stage.
-
Hainan's plastic ban is too awesome, fast food restaurants do not need to degrade bags, and takeaway brothers do not deliver!
Time of Update: 2022-10-15
. In order to prevent the pollution of disposable non-degradable plastic products and protect the ecological environment, recently, the Comprehensive Administrative and Law Enforcement Bureau of Lingao County, Hainan Province organized an interview and deployment meeting of the third-party platform for online catering services "Plastic Ban" .
-
Lanzhou Petrochemical's 35,000 tons/year special nitrile rubber plant started
Time of Update: 2022-10-15
It is reported that the 35,000-ton/year special nitrile rubber plant is a key project for Lanzhou Petrochemical to use the technical advantages of nitrile rubber to improve quality and efficiency It is reported that the 35,000-ton/year special nitrile rubber plant is a key project for Lanzhou Petrochemical to use the technical advantages of nitrile rubber to improve quality and efficiency .
-
Shanghai will speed up the full resumption of work and production after June 1!
Time of Update: 2022-10-15
Electronic passport management requirements The "Plan" proposes that in the second phase from May 22 to May 31, when companies apply for resumption of work, they will simplify the return to work reporting procedures, and speed up the application and issuance of work resumption certificates; in areas where conditions permit, the return of workers who have resumed work and production will be gradually cancelled.
-
Juren Chemical's 50,000-ton caprolactone project settled in Yueyang in 23 years and put into operation with an income of 1.75 billion
Time of Update: 2022-10-15
2 billion yuan On the morning of May 25, 2022, Hunan Yueyang Green Chemical High-tech Zone organized the "2022 Major Industrial Projects" centralized signing and completion ceremony at the project site of Hunan Juren Chemical New Material Technology Co.
-
Hongchang Electronics subsidiary obtained the invention patent certificate
Time of Update: 2022-10-15
, a wholly-owned subsidiary of the company, recently received the invention patent certificate issued by the State Intellectual Property Office, the name of the invention: a polyphenylene ether epoxy resin composition, preparation method and application Hongchang Electronics issued an announcement saying that Zhuhai Hongchang Electronic Materials Co.
-
The comprehensive energy consumption of the butadiene unit of Zhongke Refinery is the lowest
Time of Update: 2022-10-15
52% higher than the original planned output Since the beginning of this year, the plant has actively utilized the favorable conditions of the high load of the upstream plant, strengthened fine management, and produced a total of 26,400 tons of butadiene, which is 23.
-
The total progress is about 93.96% completed!
Time of Update: 2022-10-15
96%, the main projects of various public works have been handed over in succession, the main production devices have entered the peak period of electrical and instrument installation, and each link is steadily advancing according to the established time node According to reports, the overall progress of the project has been completed by about 93.