-
The fracturing construction of Dongye Shen 2 Well of the Exploration Branch was successfully completed
Time of Update: 2021-11-04
Sinopec News Network reported recently that the exploration branch took 19 days to complete the fracturing of a total of 30 sections of the Dongye Shen 2 Well in stages .
-
Shanghai Bureau does practical work for Party A to add impetus to development
Time of Update: 2021-11-04
7 engineers actively and carefully analyzed and judged accurately, and helped Party A's platform to eliminate winch equipment failures in a timely manner to ensure the timeliness of production operations .
-
The optimization of external drainage quality of Guangzhou Petrochemical's heavy-duty unit has achieved results
Time of Update: 2021-11-03
, to further improve the external drainage quality, and create conditions for the high-load operation of the device in the next cycle .
-
Shengli Technical Inspection Center completed the survey and test of methane emission in Northwest Oilfield
Time of Update: 2021-11-03
Recently, the methane emission test project team of the energy monitoring station of the Shengli Oilfield Technology Testing Center completed the survey and testing of the methane emission of the Northwest Oilfield Branch .
-
Jianghan Oilfield's "Two Remedies" Brings Out "Essence" of Oil Wells
Time of Update: 2021-11-03
The principle is to find the right pulse to make a good prescription, reasonably adjust the working parameters such as pump diameter, pump hang, and stroke rate, and timely "health care and physical therapy" to improve the efficiency of the mechanical production system and ensure the smooth and efficient operation of the oil well .
-
Northwest Oilfield does "fine work" and calculates "benefit account"
Time of Update: 2021-11-03
" With the goal of maximizing benefits, the Yakela Gas Production Plant focuses on value creation, strengthens the implementation of the main responsibility of reservoir operation and management, optimizes the best matching plan of "reserves, production, and benefits", expands multiple ways to create benefits, and adjusts output and products , Cost structure, invigorating idle assets, a total of 14.
-
Baling Petrochemical continues to carry out non-leakage special governance actions
Time of Update: 2021-11-03
In recent years, Baling Petrochemical attaches great importance to the creation of non-leakage devices, and continues to carry out non-leakage special management actions to improve the reliability and integrity of the equipment.
-
New breakthrough in old gas reservoirs of Shaximiao Formation in Xinchang Southwest Oil and Gas
Time of Update: 2021-11-03
In the next step, Southwest Oil and Gas Branch will continue to deepen research, continue to carry out fine description of gas reservoirs, and comprehensively comb the development potential of Shaximiao Formation gas reservoirs in conjunction with breakthroughs in new engineering technology, achieve high-quality deployment, and support the continued stable production and efficiency of gas fields in old areas .
-
Maoming Petrochemical achieved the first fire pump frame purchase
Time of Update: 2021-11-03
Mao Yihua, a planner in the equipment room of the Maoming Petrochemical Supply Center, tried every means to overcome the procurement difficulties of the fire pump framework agreement .
Through public bidding, the framework agreement procurement of fire pumps was realized, and the efficiency of supply guarantee and bargaining power were comprehensively improved.
-
Ten Jianfu Refining Plant Renovation Project Strictly Control the Safety of Subcontractors
Time of Update: 2021-11-03
Since the beginning of this year, Shijian Company has continued to carry out special safety rectification work for subcontractors in key construction projects, and has continuously improved the safety management system of subcontractors through the implementation of the "pre-audit + on-site evaluation" strategy for safety management capabilities of subcontractors .
-
The Changling Refining & Chemical Yangtze River Oil Terminal Quality Improvement Project is steadily advancing
Time of Update: 2021-11-03
Recently, the Changling Refining and Chemical Yangtze River Oil Product Handling Terminal Quality Improvement Project has entered the stage of laying new oil pipelines and nitrogen lines, and the construction of various nodes has been steadily promoted .
-
Dongsheng Gas Field is busy with upgrading and upgrading of gathering and transportation of "Driving Diseases, Reinforcing Elements and Preventing Diseases"
Time of Update: 2021-11-03
Sinopec News. com. In the late summer and early autumn, the summer heat is still strong. Few people can think of the cold in the Ordos work area in winter in this season. But in the eyes of the ga
-
Maoming Petrochemical's entire process optimization reduces hydrogen production costs
Time of Update: 2021-11-03
How to increase the load of hydrogen production from dry gas and reduce coal Hydrogen production load has become the focus of current optimization and efficiency creation .
-
Zhongyuan Petrochemical conducts in-depth treatment of VOCs in grease traps
Time of Update: 2021-11-03
According to the technical guidelines for performance grading of key industries in heavy pollution weather in 2020, the VOCs of a grease trap odor treatment device for olefins must be processed by the combustion method in order to meet the conditions for establishing a Class A enterprise .
-
Chuanwei Chemical's optimization and transformation project makes the production process lower carbon
Time of Update: 2021-11-01
Recently, the optimization and transformation project of the distillation system of the 770,000 tons of methanol plant of Chuanwei Chemical Company opened up the whole process and produced qualified 95-type alcohol-based fuel, marking the successful start-up of the distillation system optimization and transformation project of the methanol operation department .
-
Novak, Russia: OPEC is expected to stick to the agreement to increase production by 400,000 barrels per day at the November meeting
Time of Update: 2021-11-01
According to foreign news on October 25, Russian Deputy Prime Minister Novak said on Monday that it is expected that at the November 4 meeting, OPEC will stick to the previously reached agreement to increase oil production by 400,000 barrels per day .
-
Shengli Lusheng has achieved practical results in controlling the problem of external channeling of heavy oil thermal recovery pipes
Time of Update: 2021-11-01
However, with multiple rounds of steam huff and puff production in heavy oil blocks, high-temperature and high-pressure steam causes thermal expansion of the reservoir rock skeleton, cement ring, and oil layer casing, which can easily cause solidification.
-
U.S. crude oil inventories are expected to increase last week, oil product inventories may decline
Time of Update: 2021-11-01
Foreign News reported on October 25 that a preliminary investigation released on Monday showed that US crude oil inventories may increase last week, while gasoline and distillate inventories are expected to decline .
5 million barrels, and analysts expected an increase of 1.
-
North China's independent research and development of bio-based nanobubble discharge agent has significant application effects
Time of Update: 2021-11-01
Aiming at the problem that the foaming, stabilizing and liquid carrying performance of the existing foaming agent in Daniudi gas field in low-pressure and low-yield gas wells causes poor foaming effect, the North China Institute of Engineering independently developed a foam with lower water content and stronger foam stabilization ability.
-
Petrochemical Machinery held a 5S management training class
Time of Update: 2021-11-01
In order to consolidate the foundation of lean grassroots promotion and strengthen on-site lean improvement, Sinopec Machinery held a 5S management training class on October 21-23 to promote the construction of lean dojo in the Sanji branch .