-
Categories
-
Pharmaceutical Intermediates
-
Active Pharmaceutical Ingredients
-
Food Additives
- Industrial Coatings
- Agrochemicals
- Dyes and Pigments
- Surfactant
- Flavors and Fragrances
- Chemical Reagents
- Catalyst and Auxiliary
- Natural Products
- Inorganic Chemistry
-
Organic Chemistry
-
Biochemical Engineering
- Analytical Chemistry
-
Cosmetic Ingredient
- Water Treatment Chemical
-
Pharmaceutical Intermediates
Promotion
ECHEMI Mall
Wholesale
Weekly Price
Exhibition
News
-
Trade Service
Sinopec News Network reported on October 21, at the construction site of Fujian United Petrochemical EO/EG (Ethylene Oxide/Ethylene Glycol) Plant Inspection and Refurbishment Project.
The subcontractor unit of the company conducts safety management capability audit to ensure that the safety management of the subcontractor unit is under overall control in the EO/EG (Ethylene Oxide/Ethylene Glycol) plant inspection and modification project
.
Since the beginning of this year, Shijian Company has continued to carry out special safety rectification work for subcontractors in key construction projects, and has continuously improved the safety management system of subcontractors through the implementation of the "pre-audit + on-site evaluation" strategy for safety management capabilities of subcontractors
.
In the face of the tight construction period and severe safety control situation of the Fujian United Petrochemical EO/EG inspection and modification project, the project department of the ten construction company started with three key lines, including subcontractor safety management personnel qualification review, admission review, and job interviews.
Strictly control the audit of the safety management capabilities of subcontractors, and ensure that the safety personnel of subcontractors enter the site
.
After winning the bid for the EO/EG inspection and modification project in December last year, the project department formulated the subcontractor’s safety management personnel review standards based on the hidden risks of the construction site, the rectification of safety violations, and emergency response.
"The project department implements a one-vote veto system for the safety management of subcontractors.
As long as the safety assessment item fails to meet the standard requirements, subcontractors with high levels of construction technology will not be able to obtain a pass to enter the site
.
" Shijian Fu Refining Project Department manager Li Yuankai introduced
According to statistics, from January to September, the project department adopted the "pre-review" strategy for subcontractors.
Seven subcontractors were refused entry because they did not meet the standards of the safety management capability evaluation.
The frequency of potential safety risks during construction has dropped by more than 75% from the beginning of the project
.
(Tian Yuanwu)