echemi logo
Product
  • Product
  • Supplier
  • Inquiry
    Home > Chemicals Industry > Petrochemical News > Zhongke Refining and Chemical Reformation Heavy Alcohol Tank Storage and Transportation Project

    Zhongke Refining and Chemical Reformation Heavy Alcohol Tank Storage and Transportation Project

    • Last Update: 2021-08-29
    • Source: Internet
    • Author: User
    Search more information of high quality chemicals, good prices and reliable suppliers, visit www.echemi.com

    Sinopec News Network reported on July 15, Zhongke Refinery completed the construction of a 3000 cubic meter seawater ballast water storage tank to be converted into a heavy alcohol storage tank, and completed the transformation of the tank pipeline at the same time to improve the receiving capacity of heavy alcohol.
    It can save about 210,000 yuan in transfer costs
    .

    The industrial waste incinerator in the purified water zone of the Ministry of Public Works now mainly receives and stores the heavy alcohol waste liquid produced by the EO/EG device by two heavy alcohol tanks
    .


    In order to ensure that industrial waste incinerators can receive heavy alcohol waste liquids during shutdown and overhaul, to reduce the operating load of EO/EG devices and enhance the ability to deal with heavy alcohol wastes during shutdown conditions, the leader of the Public Works Department The team actively connected with the Luoyang Institute, and after demonstration, decided to use the idle seawater ballast water adjustment tank and related pipelines to divert and store heavy alcohol waste liquid, and enhance the ability of industrial waste incinerators to receive heavy alcohol waste liquid


    In order to ensure the safety of on-site construction, the technicians discussed and worked out a detailed plan for cleaning and purging heavy alcohol pipelines
    .


    Regional management personnel are rooted in the site, and through methods such as blind plate isolation, nitrogen purge, steam purge, etc.


    In order to put the seawater ballast water regulating tank and transfer pipeline into operation smoothly and safely, the management personnel of the purified water area gathered in the operation room again for detailed discussion and research, and formulated an operation plan for receiving heavy alcohol, and organized various teams in the purified water area to carry out Training and learning
    .

    The transformation of the heavy alcohol tank storage and transportation project not only effectively avoids the risk of the automobile transfer process, but also improves the heavy alcohol receiving capacity of the device, which provides a strong guarantee for the maintenance of industrial incinerators and the continuous production of EO/EG devices
    .


    (Li Xianbi, Zhao Langting)

    This article is an English version of an article which is originally in the Chinese language on echemi.com and is provided for information purposes only. This website makes no representation or warranty of any kind, either expressed or implied, as to the accuracy, completeness ownership or reliability of the article or any translations thereof. If you have any concerns or complaints relating to the article, please send an email, providing a detailed description of the concern or complaint, to service@echemi.com. A staff member will contact you within 5 working days. Once verified, infringing content will be removed immediately.

    Contact Us

    The source of this page with content of products and services is from Internet, which doesn't represent ECHEMI's opinion. If you have any queries, please write to service@echemi.com. It will be replied within 5 days.

    Moreover, if you find any instances of plagiarism from the page, please send email to service@echemi.com with relevant evidence.