-
Categories
-
Pharmaceutical Intermediates
-
Active Pharmaceutical Ingredients
-
Food Additives
- Industrial Coatings
- Agrochemicals
- Dyes and Pigments
- Surfactant
- Flavors and Fragrances
- Chemical Reagents
- Catalyst and Auxiliary
- Natural Products
- Inorganic Chemistry
-
Organic Chemistry
-
Biochemical Engineering
- Analytical Chemistry
-
Cosmetic Ingredient
- Water Treatment Chemical
-
Pharmaceutical Intermediates
Promotion
ECHEMI Mall
Wholesale
Weekly Price
Exhibition
News
-
Trade Service
Sinopec News Network reported on July 15, Zhongke Refinery completed the construction of a 3000 cubic meter seawater ballast water storage tank to be converted into a heavy alcohol storage tank, and completed the transformation of the tank pipeline at the same time to improve the receiving capacity of heavy alcohol.
It can save about 210,000 yuan in transfer costs
.
The industrial waste incinerator in the purified water zone of the Ministry of Public Works now mainly receives and stores the heavy alcohol waste liquid produced by the EO/EG device by two heavy alcohol tanks
.
In order to ensure that industrial waste incinerators can receive heavy alcohol waste liquids during shutdown and overhaul, to reduce the operating load of EO/EG devices and enhance the ability to deal with heavy alcohol wastes during shutdown conditions, the leader of the Public Works Department The team actively connected with the Luoyang Institute, and after demonstration, decided to use the idle seawater ballast water adjustment tank and related pipelines to divert and store heavy alcohol waste liquid, and enhance the ability of industrial waste incinerators to receive heavy alcohol waste liquid
In order to ensure the safety of on-site construction, the technicians discussed and worked out a detailed plan for cleaning and purging heavy alcohol pipelines
.
Regional management personnel are rooted in the site, and through methods such as blind plate isolation, nitrogen purge, steam purge, etc.
In order to put the seawater ballast water regulating tank and transfer pipeline into operation smoothly and safely, the management personnel of the purified water area gathered in the operation room again for detailed discussion and research, and formulated an operation plan for receiving heavy alcohol, and organized various teams in the purified water area to carry out Training and learning
.
The transformation of the heavy alcohol tank storage and transportation project not only effectively avoids the risk of the automobile transfer process, but also improves the heavy alcohol receiving capacity of the device, which provides a strong guarantee for the maintenance of industrial incinerators and the continuous production of EO/EG devices
.
(Li Xianbi, Zhao Langting)