-
Categories
-
Pharmaceutical Intermediates
-
Active Pharmaceutical Ingredients
-
Food Additives
- Industrial Coatings
- Agrochemicals
- Dyes and Pigments
- Surfactant
- Flavors and Fragrances
- Chemical Reagents
- Catalyst and Auxiliary
- Natural Products
- Inorganic Chemistry
-
Organic Chemistry
-
Biochemical Engineering
- Analytical Chemistry
-
Cosmetic Ingredient
- Water Treatment Chemical
-
Pharmaceutical Intermediates
Promotion
ECHEMI Mall
Wholesale
Weekly Price
Exhibition
News
-
Trade Service
As of March 10, the 200,000-ton/year polypropylene plant of Zhongke Refinery has been running smoothly for 180 days, and the raw material propylene feed has been maintained at 25 tons/hour
.
Since it was officially put into operation in September last year, the device has produced a total of 70,900 tons of products, produced 7 brands, and completed the production tasks as required
.
Since it was officially put into operation in September last year, the device has produced a total of 70,900 tons of products, produced 7 brands, and completed the production tasks as required
.
In order to ensure the safe and stable operation of the device, they organize management personnel and technical backbones to analyze and sort out the bottlenecks restricting the production of the device, keep an eye on the weak links in the production process, discuss countermeasures, formulate effective measures, and establish a rectification ledger to conduct closed-loop processing to effectively ensure The device operates
.
During the production and operation stage, Shi Hongyin, the company's equipment engineer, led Zhang Qingsheng, Hu Houbiao and other party members and comrades to play an exemplary role as party members.
A series of problems, such as the high report of the material level of the machine hopper and the leakage of the vibrating screen, provide a strong guarantee for the smooth operation of the device
.