-
Categories
-
Pharmaceutical Intermediates
-
Active Pharmaceutical Ingredients
-
Food Additives
- Industrial Coatings
- Agrochemicals
- Dyes and Pigments
- Surfactant
- Flavors and Fragrances
- Chemical Reagents
- Catalyst and Auxiliary
- Natural Products
- Inorganic Chemistry
-
Organic Chemistry
-
Biochemical Engineering
- Analytical Chemistry
-
Cosmetic Ingredient
- Water Treatment Chemical
-
Pharmaceutical Intermediates
Promotion
ECHEMI Mall
Wholesale
Weekly Price
Exhibition
News
-
Trade Service
Sinopec News.
com.
cn on August 16, after more than 20 days of hard work, Yangzi Petrochemical’s EVA device successfully completed the first elimination of the shortage, successfully produced qualified EVA products, and was ready to switch to new brands
.
Starting on July 20, Yangzi Petrochemical’s newly built EVA device officially started the shutdown and elimination mode.
This is the first time that the device has been fully eliminated and repaired since it successfully drove on May 6 and produced qualified EVA products
.
Yangzi Petrochemical’s first ultra-high pressure device for the EVA installation was affected by the hot and rainy weather and the outbreak of the epidemic in Nanjing.
In order to ensure that the device can be safely shut down and delivered smoothly, Yangzi Petrochemical made an early completion in accordance with the standards for the overhaul of the device.
During the elimination period, in the face of many difficulties such as the shortage of maintenance personnel and the high pressure of epidemic prevention, Yangzi Petrochemical personnel at all levels in accordance with the predetermined plan, division of labor and responsibility, cooperation with each other, and on the basis of solid epidemic prevention and control, conscientiously implement elimination and epidemic prevention measures , Personnel grid management and control, time-sharing and peak-shift operations
.
The elimination area has been hard-core isolation and closed management, only one entrance and exit are kept, temperature measurement points are set up, and the backbone of the party members is on duty.
All personnel entering and exiting are registered for temperature measurement and disinfection, strictly controlled, and the construction unit personnel are fully gridded.
"It is necessary to do a good job of repairing the EVA device for the first time in accordance with the quality engineering standards", the company leader put forward the request
After the elimination of vacancies, personnel at all levels of Yangzi Petrochemical focused on strengthening on-site 5S management, setting up spare parts stacking areas, garbage recycling areas, tools and equipment placement areas, and overhaul schedule quality grid charts, and strictly implemented the "clearance of the site after completion of work".