Categories
-
Pharmaceutical Intermediates
-
Active Pharmaceutical Ingredients
-
Food Additives
- Industrial Coatings
- Agrochemicals
- Dyes and Pigments
- Surfactant
- Flavors and Fragrances
- Chemical Reagents
- Catalyst and Auxiliary
- Natural Products
- Inorganic Chemistry
-
Organic Chemistry
-
Biochemical Engineering
- Analytical Chemistry
-
Cosmetic Ingredient
- Water Treatment Chemical
-
Pharmaceutical Intermediates
Promotion
ECHEMI Mall
Wholesale
Weekly Price
Exhibition
News
-
Trade Service
Sinopec News Network News on August 5, after 4 days of ultra-high pressure steam ("SS") pipeline purge work was completed, after confirmation by the project team, project supervision, construction unit, relevant professional departments and other units, green steam supply The SS pipeline in the center was qualified for purging and shooting, which marked the completion of another important node in the project of Yangzi Petrochemical Green Steam Supply Center
.
The SS pipeline is the ultra-high pressure steam supplied by Yangzi Petrochemical’s green steam supply center to the company’s olefin plant, which is mainly used to replace the auxiliary boiler of the olefin plant to produce steam
.
As the SS pipeline steam will enter the olefin plant turbine, in order to ensure the safe operation of the turbine, it must be purged to ensure the quality of the steam
.
In order to ensure the smooth progress of the purging work, the thermal power plant, project team, commissioning and other units formulate the purging plan in advance, and report to the relevant professional department of the company for review
.
Since the location of the purged pipeline is on important road sections such as Ethylene Avenue, Yangzi Petrochemical has organized several special meetings to ensure traffic safety during the purging period and reduce the impact of noise
.
The thermal power plant has formulated in advance the "Green Steam Supply Center Project SS Steam Pipeline Purge Safety and Environmental Protection Special Plan", "Green Steam Supply Center Project SS Pipeline Purge Safety Measures for the Silencer Area during Steam Purge" and other plans.
On-site safety measures have been approved by the company's relevant professional departments and projects.
Units, thermal power plants, olefin plants and other units confirmed that the "three checks and four determinations" of the SS pipeline construction have been confirmed on-site for many times
.
In order to control the scope of influence to the minimum, arrange the purge to be carried out at night and non-working days
.
The thermal power plant will work with the project team to do a good job in the follow-up commissioning of the green steam supply center project and the start-up of the entire group to ensure the successful start-up of the project