-
Categories
-
Pharmaceutical Intermediates
-
Active Pharmaceutical Ingredients
-
Food Additives
- Industrial Coatings
- Agrochemicals
- Dyes and Pigments
- Surfactant
- Flavors and Fragrances
- Chemical Reagents
- Catalyst and Auxiliary
- Natural Products
- Inorganic Chemistry
-
Organic Chemistry
-
Biochemical Engineering
- Analytical Chemistry
-
Cosmetic Ingredient
- Water Treatment Chemical
-
Pharmaceutical Intermediates
Promotion
ECHEMI Mall
Wholesale
Weekly Price
Exhibition
News
-
Trade Service
News from China Petrochemical News “The control room reported that the on-site high circulation heat exchanger has been switched from the A series to the B series, and the operation is normal, and the production parameters of the device are stable.
" Hearing the good news from the walkie-talkie, the Yangzi Petrochemical EVA device Director Wang Lizhi's heart that had been hanging around finally fell
.
Since the start-up of the EVA device, due to the imperfect design of the sequence control program of the patenter, the outlet temperature of the secondary unit will be high during high-cycle switching, resulting in emergency interlocking and stopping of the device, which has become a "roadblocker" that affects long-term stable operation.
Each switchover caused severe fluctuations in production and even caused the plant to stop
.
The high-pressure circulating gas processing unit of the EVA device is an important part of the device, and its main function is to separate the waste wax and waste oil entrained in the circulating gas through a cooler
.
However, as the running time increases, the waste oil and waste wax will scale on the surface of the heat exchanger, which will cause the heat exchange effect to deteriorate and affect the stable operation of the device.
In order to fundamentally solve this technical problem, the device leaders and technical backbones formed a tough team to face the challenge directly, focusing on me, carefully studying the sequence control program logic, comprehensively analyzing the change trend of the process parameters of the switching process, and organizing special analysis meetings to conduct in-depth analysis.
Due to fluctuations, the defects of the sequence control program logic were improved, the operation process was optimized, and the emergency plan was formulated to successfully overcome this problem that affects the long-term operation of the device
.
(Dajun)