-
Categories
-
Pharmaceutical Intermediates
-
Active Pharmaceutical Ingredients
-
Food Additives
- Industrial Coatings
- Agrochemicals
- Dyes and Pigments
- Surfactant
- Flavors and Fragrances
- Chemical Reagents
- Catalyst and Auxiliary
- Natural Products
- Inorganic Chemistry
-
Organic Chemistry
-
Biochemical Engineering
- Analytical Chemistry
-
Cosmetic Ingredient
- Water Treatment Chemical
-
Pharmaceutical Intermediates
Promotion
ECHEMI Mall
Wholesale
Weekly Price
Exhibition
News
-
Trade Service
At 10:00 on December 30, 2021, the energy-saving renovation project of the BA-111 cracking furnace of the ethylene combined unit of the Yangzi Petrochemical Olefin Plant was completed and put into operation, achieving the goal of a successful start-up after feeding
The BA-111 cracking furnace was built in December 1995.
The transformation adopts Sinopec's own advanced technology, mainly for energy-saving transformation of furnace tubes and waste heat boilers of cracking furnaces
Subsequently, the cracking furnace enters the stage of preparation for charging and driving
It is reported that after the project is completed and put into operation, it can effectively reduce the consumption of fuel gas, increase the production of ultra-high pressure steam, prolong the operating cycle of the furnace, significantly improve the thermal efficiency of the cracking furnace, improve the operating efficiency of the furnace, and achieve energy saving and efficiency