-
Categories
-
Pharmaceutical Intermediates
-
Active Pharmaceutical Ingredients
-
Food Additives
- Industrial Coatings
- Agrochemicals
- Dyes and Pigments
- Surfactant
- Flavors and Fragrances
- Chemical Reagents
- Catalyst and Auxiliary
- Natural Products
- Inorganic Chemistry
-
Organic Chemistry
-
Biochemical Engineering
- Analytical Chemistry
-
Cosmetic Ingredient
- Water Treatment Chemical
-
Pharmaceutical Intermediates
Promotion
ECHEMI Mall
Wholesale
Weekly Price
Exhibition
News
-
Trade Service
Recently, media reporters learned from the Development and Reform Commission of Xinjiang Uygur Autonomous Region that the first electric heating boiler of the wind power heating project of the Dabancheng plant of Xinjiang fertilizer plant was successfully electrified, marking the commissioning of the first wind power clean heating project in Xinjiang
.
After the project is completed and put into operation, it will effectively improve the winter heating quality of 200,000 square meters of local residential buildings, promote the local consumption of 28.
8 million kilowatt-hours of wind power, save 9,158 tons of standard coal, and correspondingly reduce 25,940 tons of carbon dioxide and 1,652 tons of sulfur dioxide emitted by coal, which has a positive demonstration effect
on promoting the "Electrification Xinjiang" project and promoting the absorption of new energy.
The project is funded and constructed by Xinjiang New Energy (Group) Co.
, Ltd.
, and is responsible for operation, maintenance and heat supply, and is the first batch of pilot projects
for clean heating of wind power in Xinjiang.
Its heating area is 200,000 square meters, and the supporting electric farm is the first and second phase wind farms of Urumqi Tori New Wind Power Co.
, Ltd.
, with a wind farm scale of 99,000 kilowatts
.
Recently, media reporters learned from the Development and Reform Commission of Xinjiang Uygur Autonomous Region that the first electric heating boiler of the wind power heating project of the Dabancheng plant of Xinjiang fertilizer plant was successfully electrified, marking the commissioning of the first wind power clean heating project in Xinjiang
.
After the project is completed and put into operation, it will effectively improve the winter heating quality of 200,000 square meters of local residential buildings, promote the local consumption of 28.
8 million kilowatt-hours of wind power, save 9,158 tons of standard coal, and correspondingly reduce 25,940 tons of carbon dioxide and 1,652 tons of sulfur dioxide emitted by coal, which has a positive demonstration effect
on promoting the "Electrification Xinjiang" project and promoting the absorption of new energy.
The project is funded and constructed by Xinjiang New Energy (Group) Co.
, Ltd.
, and is responsible for operation, maintenance and heat supply, and is the first batch of pilot projects
for clean heating of wind power in Xinjiang.
Its heating area is 200,000 square meters, and the supporting electric farm is the first and second phase wind farms of Urumqi Tori New Wind Power Co.
, Ltd.
, with a wind farm scale of 99,000 kilowatts
.