-
Categories
-
Pharmaceutical Intermediates
-
Active Pharmaceutical Ingredients
-
Food Additives
- Industrial Coatings
- Agrochemicals
- Dyes and Pigments
- Surfactant
- Flavors and Fragrances
- Chemical Reagents
- Catalyst and Auxiliary
- Natural Products
- Inorganic Chemistry
-
Organic Chemistry
-
Biochemical Engineering
- Analytical Chemistry
-
Cosmetic Ingredient
- Water Treatment Chemical
-
Pharmaceutical Intermediates
Promotion
ECHEMI Mall
Wholesale
Weekly Price
Exhibition
News
-
Trade Service
At 11:18 on November 25, 2021, as the last wind turbine was connected to the grid, all 91 wind turbines of the 500,000-kilowatt offshore wind power project in Shanwei Houhu of China General Nuclear Power Group (CGN) were connected to the grid for power generation, becoming a domestic shipping order.
One of the offshore wind power projects with the largest body capacity
.
The Shanwei Houhu offshore wind power project site is located in the sea area south of Lufenghudong Town, Shanwei City, Guangdong Province.
The center of the site is about 12 kilometers offshore and the water depth is 23 to 26 meters.
According to relevant personnel from China General Nuclear Power Corporation, the coastal waters of eastern Guangdong where the Shanwei Houhu Offshore Wind Power Project is located is one of the most complicated sea areas in China.
The annual effective construction window is less than 100 days, the geological conditions are complex and the construction is difficult
Statistics show that the project’s annual on-grid power can reach 1.
489 billion kilowatt-hours.
Up to now, CGN has put into operation nearly 1 million kilowatts of offshore wind power in Guangdong, and has 1.
15 million kilowatts of projects under construction