-
Categories
-
Pharmaceutical Intermediates
-
Active Pharmaceutical Ingredients
-
Food Additives
- Industrial Coatings
- Agrochemicals
- Dyes and Pigments
- Surfactant
- Flavors and Fragrances
- Chemical Reagents
- Catalyst and Auxiliary
- Natural Products
- Inorganic Chemistry
-
Organic Chemistry
-
Biochemical Engineering
- Analytical Chemistry
-
Cosmetic Ingredient
- Water Treatment Chemical
-
Pharmaceutical Intermediates
Promotion
ECHEMI Mall
Wholesale
Weekly Price
Exhibition
News
-
Trade Service
A few days ago, Sinopec's first offshore wind power project CZ4-1 offshore wind farm in Hainan Danzhou CZ4-1 wind measuring tower wind measurement equipment started operation, marking Sinopec's offshore wind power business development has entered a new stage
.
The designed installed capacity of CZ4-1 offshore wind farm in Danzhou, Hainan is 600 MW, which is implemented by Xinxing Company
.
The project uses offshore wind power equipment construction to provide green power support for Hainan Refinery and Chemical's ongoing million-ton ethylene project, provide green power replacement for existing oil refining and aromatics units, and help Hainan's clean energy island construction and high-quality economic development
.
Wind measurement is the first step in the implementation of a wind farm project, which mainly provides basic data for project demonstration and design
.
The wind measurement tower for this wind measurement is located in the sea outside Yangpu, Danzhou City, Hainan Province.
The tower is 120 meters high and has two sets of independent wind measurement instruments
.
The wind tower is the first offshore wind tower of Sinopec, and it is also the wind tower with the highest offshore wind measurement height in Hainan Province at present.
.