echemi logo
Product
  • Product
  • Supplier
  • Inquiry
    Home > Chemicals Industry > Chemical Technology > The Shendan high-speed railway officially opened today

    The Shendan high-speed railway officially opened today

    • Last Update: 2022-11-19
    • Source: Internet
    • Author: User
    Search more information of high quality chemicals, good prices and reliable suppliers, visit www.echemi.com

    At 6:06 on September 1, the Shenyang-Dan high-speed railway (Shenyang-Dandong high-speed railway) was officially put into operation
    .
    The minimum travel time from Shenyang to Dandong has been shortened from 3 hours 34 minutes to 1 hour 11 minutes
    .

    Shenyang Dan high-speed railway starts from Shenyang City, passes through Benxi, Fenghuangcheng, and ends in Dandong City, with a total length of 208 kilometers, with 8 stations in Shenyang South, Benxi New Town, Benxi, Nanfenbei, Tongyuanbao West, Fengcheng East, Wulongbei East and Dandong, with an initial operating speed of 250 kilometers
    per hour.

    The construction of the Shendan high-speed railway began in April 2010, and the joint commissioning and testing
    began in June 2015.
    At the beginning of operation, 40 pairs
    of mobile trains will be arranged.

    The Shenyang-Dan high-speed railway connecting the Qin-Shenyang high-speed railway and the Harbin high-speed railway will further improve the structure of the Northeast Railway network, form a one-hour economic life circle from Shenyang to Dandong, provide great convenience for mass travel, and at the same time release the existing cable transportation capacity, which is of great significance for improving the collection and distribution conditions of
    Dandong Port, improving regional economic competitiveness, and serving the economic and social development of the old industrial base in Northeast China.

    At 6:06 on September 1, the Shenyang-Dan high-speed railway (Shenyang-Dandong high-speed railway) was officially put into operation
    .
    The minimum travel time from Shenyang to Dandong has been shortened from 3 hours 34 minutes to 1 hour 11 minutes
    .

    Shendan high-speed rail

    Shenyang Dan high-speed railway starts from Shenyang City, passes through Benxi, Fenghuangcheng, and ends in Dandong City, with a total length of 208 kilometers, with 8 stations in Shenyang South, Benxi New Town, Benxi, Nanfenbei, Tongyuanbao West, Fengcheng East, Wulongbei East and Dandong, with an initial operating speed of 250 kilometers
    per hour.

    The construction of the Shendan high-speed railway began in April 2010, and the joint commissioning and testing
    began in June 2015.
    At the beginning of operation, 40 pairs
    of mobile trains will be arranged.

    The Shenyang-Dan high-speed railway connecting the Qin-Shenyang high-speed railway and the Harbin high-speed railway will further improve the structure of the Northeast Railway network, form a one-hour economic life circle from Shenyang to Dandong, provide great convenience for mass travel, and at the same time release the existing cable transportation capacity, which is of great significance for improving the collection and distribution conditions of
    Dandong Port, improving regional economic competitiveness, and serving the economic and social development of the old industrial base in Northeast China.

    This article is an English version of an article which is originally in the Chinese language on echemi.com and is provided for information purposes only. This website makes no representation or warranty of any kind, either expressed or implied, as to the accuracy, completeness ownership or reliability of the article or any translations thereof. If you have any concerns or complaints relating to the article, please send an email, providing a detailed description of the concern or complaint, to service@echemi.com. A staff member will contact you within 5 working days. Once verified, infringing content will be removed immediately.

    Contact Us

    The source of this page with content of products and services is from Internet, which doesn't represent ECHEMI's opinion. If you have any queries, please write to service@echemi.com. It will be replied within 5 days.

    Moreover, if you find any instances of plagiarism from the page, please send email to service@echemi.com with relevant evidence.