-
Categories
-
Pharmaceutical Intermediates
-
Active Pharmaceutical Ingredients
-
Food Additives
- Industrial Coatings
- Agrochemicals
- Dyes and Pigments
- Surfactant
- Flavors and Fragrances
- Chemical Reagents
- Catalyst and Auxiliary
- Natural Products
- Inorganic Chemistry
-
Organic Chemistry
-
Biochemical Engineering
- Analytical Chemistry
-
Cosmetic Ingredient
- Water Treatment Chemical
-
Pharmaceutical Intermediates
Promotion
ECHEMI Mall
Wholesale
Weekly Price
Exhibition
News
-
Trade Service
Sinochem News.
com News on July 31, with the 136,000 tons of Singaporean "Gold Island" vessel successfully berthed at the D22 berth of Dongjiakou Crude Oil Terminal of Qingdao Port, Shandong Port and successfully unloaded, marking the second phase of the crude oil terminal.
The project officially has production and operation capabilities
.
This is another key project successfully put into operation after the Dongjiakou Liquid Chemical Wharf has been put into operation, and will continue to release the comprehensive strength of Dongjiakou Port Area Wharf unloading
Shandong Port Qingdao Port Dongjiakou Port Area Crude Oil Terminal Phase II Project is a major project for the conversion of new and old kinetic energy in Shandong Province and Qingdao City.
It is mainly used for the loading and unloading of crude oil, fuel oil and diluted asphalt.
The annual design capacity is 25.
5 million tons, including a 30 A 10,000-ton oil berth and a 100,000-ton oil berth
.
The project started construction in February 2019, and passed the completion acceptance in December 2020, and has the conditions for production and operation
The commissioning of this project will enable the designed annual throughput of the oil terminal in Dongjiakou Port area to exceed 50 million tons, further enhance the operation capacity of the crude oil terminal in Qingdao Port of Shandong Port, effectively release the advantages of tank capacity and pipelines in the port area, and ease the concentration of ships in the port.