-
Categories
-
Pharmaceutical Intermediates
-
Active Pharmaceutical Ingredients
-
Food Additives
- Industrial Coatings
- Agrochemicals
- Dyes and Pigments
- Surfactant
- Flavors and Fragrances
- Chemical Reagents
- Catalyst and Auxiliary
- Natural Products
- Inorganic Chemistry
-
Organic Chemistry
-
Biochemical Engineering
- Analytical Chemistry
-
Cosmetic Ingredient
- Water Treatment Chemical
-
Pharmaceutical Intermediates
Promotion
ECHEMI Mall
Wholesale
Weekly Price
Exhibition
News
-
Trade Service
China Petroleum & Chemical News Net The strategy of simultaneous development of rock development and clastic rock development, and overall planning of crude oil and natural gas production.
Facing the unfavorable situation of insufficient replacement of natural gas production capacity and weak production stability foundation, the third oil production plant actively carried out joint research with the Exploration and Development Research Institute to comprehensively investigate the potential of the Cretaceous.
"Since the implementation of the hole-filling and layer reforming operation in March 2021, Well T759 has increased daily gas volume by 20,000 cubic meters, 12.
Rolling edge expansion work is carried out outside the mature areas of development, and logging displays and inspections are carried out in the peripheral areas.
(Shi Libin, Liu Bo, Tang Bochao)