-
Categories
-
Pharmaceutical Intermediates
-
Active Pharmaceutical Ingredients
-
Food Additives
- Industrial Coatings
- Agrochemicals
- Dyes and Pigments
- Surfactant
- Flavors and Fragrances
- Chemical Reagents
- Catalyst and Auxiliary
- Natural Products
- Inorganic Chemistry
-
Organic Chemistry
-
Biochemical Engineering
- Analytical Chemistry
-
Cosmetic Ingredient
- Water Treatment Chemical
-
Pharmaceutical Intermediates
Promotion
ECHEMI Mall
Wholesale
Weekly Price
Exhibition
News
-
Trade Service
Today, the National Energy Administration issued a notice on the "New Round of Technical Principles for Rural Power Grid Transformation and Upgrading", aiming to do a good job in the "13th Five-Year Plan" rural power grid transformation and upgrading work, clarify technical standards and requirements, ensure project quality, and improve investment efficiency
.
The notice puts forward specific technical requirements
for the transformation and upgrading of high-voltage distribution network, medium-voltage distribution network, low-voltage distribution network, low-voltage household meter, automation and information communication, reactive power compensation and voltage control.
In terms of automation and information communication, the opinions propose that the new or renovated county-level dispatching and distribution automation system should adopt the integrated construction mode of prefecture and county transfer, with the basic functions of power grid operation monitoring, remote control safety constraints, online status monitoring of operating equipment and other functions
.
New or renovated automation systems should coordinate the needs of multiple automation systems, and uniformly plan and design data acquisition platforms
.
The communication trunk lines of substations and power supply stations shall adopt optical fiber communication methods, optical fiber communication ring network links may be used in areas with conditions, and optical fiber, wireless, carrier and other communication methods may be used for decentralized communication points of medium and low voltage power
grids.
Today, the National Energy Administration issued a notice on the "New Round of Technical Principles for Rural Power Grid Transformation and Upgrading", aiming to do a good job in the "13th Five-Year Plan" rural power grid transformation and upgrading work, clarify technical standards and requirements, ensure project quality, and improve investment efficiency
.
The notice puts forward specific technical requirements
for the transformation and upgrading of high-voltage distribution network, medium-voltage distribution network, low-voltage distribution network, low-voltage household meter, automation and information communication, reactive power compensation and voltage control.
In terms of automation and information communication, the opinions propose that the new or renovated county-level dispatching and distribution automation system should adopt the integrated construction mode of prefecture and county transfer, with the basic functions of power grid operation monitoring, remote control safety constraints, online status monitoring of operating equipment and other functions
.
New or renovated automation systems should coordinate the needs of multiple automation systems, and uniformly plan and design data acquisition platforms
.
The communication trunk lines of substations and power supply stations shall adopt optical fiber communication methods, optical fiber communication ring network links may be used in areas with conditions, and optical fiber, wireless, carrier and other communication methods may be used for decentralized communication points of medium and low voltage power
grids.