-
Categories
-
Pharmaceutical Intermediates
-
Active Pharmaceutical Ingredients
-
Food Additives
- Industrial Coatings
- Agrochemicals
- Dyes and Pigments
- Surfactant
- Flavors and Fragrances
- Chemical Reagents
- Catalyst and Auxiliary
- Natural Products
- Inorganic Chemistry
-
Organic Chemistry
-
Biochemical Engineering
- Analytical Chemistry
-
Cosmetic Ingredient
- Water Treatment Chemical
-
Pharmaceutical Intermediates
Promotion
ECHEMI Mall
Wholesale
Weekly Price
Exhibition
News
-
Trade Service
On April 8, news came from the filling and filling project site of Yanchang China Coal Yuneng Chemical in Shaanxi Province that the circulating gas compressor of the main reactor of the company's PP3 (polypropylene third-line) device was successfully hoisted into place, marking the installation of the device's dynamic equipment Entering the final stage, at the same time sounded the clarion call for the construction of the installation project to be dry and fast
.
The relevant person in charge of the polyolefin project department of Yuneng Chemical introduced that the circulating gas compressor of the main reactor of the PP3 unit is the first large-scale equipment hoisting since the unit vigorously promoted the resumption of work and production and the prevention and control of the epidemic
.
It is understood that the net weight of the circulating air compressor is 52 tons, and the maximum conveying capacity is 42,100 standard square meters per hour
.
At present, the PP3 device carries out the pipeline connection of the polishing process in the circulating gas system, the "three inspections and four determinations" of the reactor system, and the purging and pressure testing
.