-
Categories
-
Pharmaceutical Intermediates
-
Active Pharmaceutical Ingredients
-
Food Additives
- Industrial Coatings
- Agrochemicals
- Dyes and Pigments
- Surfactant
- Flavors and Fragrances
- Chemical Reagents
- Catalyst and Auxiliary
- Natural Products
- Inorganic Chemistry
-
Organic Chemistry
-
Biochemical Engineering
- Analytical Chemistry
-
Cosmetic Ingredient
- Water Treatment Chemical
-
Pharmaceutical Intermediates
Promotion
ECHEMI Mall
Wholesale
Weekly Price
Exhibition
News
-
Trade Service
Comprehensive foreign media news, Google-invested Grace Hopper submarine cable has arrived in Bud in Cornwall, England after landing at the Telxius Cable Landing Station (CLS) in Sopelana (Spain) earlier this month
.
Grace Hopper will include a main line from Lumen's existing landing station to its landing facility in Bude (UK), as well as a feeder connecting
a single branch unit on the trunk line to the existing landing facility in Bilbao.
Of these, the trunk line has a total length of 6,354 kilometers and consists of 16 pairs of fibers, while the Spanish branch line will extend 837 kilometers, including 16 pairs of fibers
.
The total design capacity of each pair of fibers is approximately 22Tbps (total design capacity is approximately 352Tbps).
According to the plan, the Grace Hopper submarine cable will begin commercial operation
in 2022.
Comprehensive foreign media news, Google-invested Grace Hopper submarine cable has arrived in Bud in Cornwall, England after landing at the Telxius Cable Landing Station (CLS) in Sopelana (Spain) earlier this month
.
Grace Hopper will include a main line from Lumen's existing landing station to its landing facility in Bude (UK), as well as a feeder connecting
a single branch unit on the trunk line to the existing landing facility in Bilbao.
Of these, the trunk line has a total length of 6,354 kilometers and consists of 16 pairs of fibers, while the Spanish branch line will extend 837 kilometers, including 16 pairs of fibers
.
The total design capacity of each pair of fibers is approximately 22Tbps (total design capacity is approximately 352Tbps).
According to the plan, the Grace Hopper submarine cable will begin commercial operation
in 2022.