-
Categories
-
Pharmaceutical Intermediates
-
Active Pharmaceutical Ingredients
-
Food Additives
- Industrial Coatings
- Agrochemicals
- Dyes and Pigments
- Surfactant
- Flavors and Fragrances
- Chemical Reagents
- Catalyst and Auxiliary
- Natural Products
- Inorganic Chemistry
-
Organic Chemistry
-
Biochemical Engineering
- Analytical Chemistry
-
Cosmetic Ingredient
- Water Treatment Chemical
-
Pharmaceutical Intermediates
Promotion
ECHEMI Mall
Wholesale
Weekly Price
Exhibition
News
-
Trade Service
Sinopec News Network reported recently that the 200,000 tons/year high-performance carbon materials and supporting projects of Shantou Bo Petrochemical undertaken by the Fourth Construction Second Engineering Company of the Refining and Chemical Engineering Group were delivered to high standards
.
The construction site of the project is located in the old factory area that is in production and operation.
The construction area is only 80 meters in length and 45 meters in width.
The construction site is narrow, equipment and large steel structures are extremely difficult to hoist, and the professional operations are highly overlapping
.
The project department improved the construction method, looked for open space outside the site for prefabrication of equipment and steel structure while carrying out civil construction, and made reasonable use of the time difference during hoisting to avoid the location of the crane station affecting the entry and exit of civil construction vehicles
(Qu Zhaogui Jiao Wenpei)