-
Categories
-
Pharmaceutical Intermediates
-
Active Pharmaceutical Ingredients
-
Food Additives
- Industrial Coatings
- Agrochemicals
- Dyes and Pigments
- Surfactant
- Flavors and Fragrances
- Chemical Reagents
- Catalyst and Auxiliary
- Natural Products
- Inorganic Chemistry
-
Organic Chemistry
-
Biochemical Engineering
- Analytical Chemistry
-
Cosmetic Ingredient
- Water Treatment Chemical
-
Pharmaceutical Intermediates
Promotion
ECHEMI Mall
Wholesale
Weekly Price
Exhibition
News
-
Trade Service
Sinopec News Network reported recently that the 200,000-ton/year high-performance carbon material and supporting project construction tasks of Shantou Bo Petrochemical Co.
According to reports, the construction site of the project is located in the old factory area that is in production and operation, and the construction work area is surrounded by operating devices on all sides.
During the civil construction, the project department looks for open space outside the site for equipment and structural prefabrication, and makes reasonable use of the time difference during hoisting to avoid the installation of professional crane stations that affect the time of civil construction.
The staff involved in the project department of the Fourth Construction Second Engineering Company proceeded from the actual situation, improved the construction method, overcame various difficulties in the construction, carried forward the iron army spirit of fighting, grabbing, solid, and careful, and finally achieved high standards and high quality to complete the construction tasks.
(Qu Zhaogui Jiao Wenpei)