-
Categories
-
Pharmaceutical Intermediates
-
Active Pharmaceutical Ingredients
-
Food Additives
- Industrial Coatings
- Agrochemicals
- Dyes and Pigments
- Surfactant
- Flavors and Fragrances
- Chemical Reagents
- Catalyst and Auxiliary
- Natural Products
- Inorganic Chemistry
-
Organic Chemistry
-
Biochemical Engineering
- Analytical Chemistry
-
Cosmetic Ingredient
- Water Treatment Chemical
-
Pharmaceutical Intermediates
Promotion
ECHEMI Mall
Wholesale
Weekly Price
Exhibition
News
-
Trade Service
On May 26, the first integrated platform for offshore production and repair in PetroChina's self-operated area, the Chenghai .
In the 1990s, Dagang Oilfield extended its oil exploration tentacles to the oce.
In 2018, Dagang Oilfield Company started the dream-seeking road of "offshore oil production" in the self-operated beach ar.
As the first 10,000-ton-level mining and repairing integrated platform independently researched, designed, constructed and put into operation by PetroChina, Chenghai .
The platform adopts a three-layer deck layout structure with a total area of about 7,800 square meters, which can meet the development needs of 3,500 cubic meters of liquid per day, 3,200 cubic meters of daily water injection and the living needs of 55 peop.
The platform currently produces 420 tons of crude oil per day, and the annual crude oil output is expected to reach 200,000 to.