-
Categories
-
Pharmaceutical Intermediates
-
Active Pharmaceutical Ingredients
-
Food Additives
- Industrial Coatings
- Agrochemicals
- Dyes and Pigments
- Surfactant
- Flavors and Fragrances
- Chemical Reagents
- Catalyst and Auxiliary
- Natural Products
- Inorganic Chemistry
-
Organic Chemistry
-
Biochemical Engineering
- Analytical Chemistry
-
Cosmetic Ingredient
- Water Treatment Chemical
-
Pharmaceutical Intermediates
Promotion
ECHEMI Mall
Wholesale
Weekly Price
Exhibition
News
-
Trade Service
Recently, the Engineering Institute of the Shanghai Offshore Oil Bureau won the bid for the detailed design project of the TEG (Triethylene Glycol Dehydration) module structure of the upper part of the Indonesian floating production plant through an open bidding
.
This is the first TEG module design project of a floating production plant undertaken in China, and it is also the first overseas offshore engineering design project that the Shanghai Offshore Oil Bureau Engineering Institute has won the bid, marking the institute's breakthrough in overseas markets
The production facility is located in the southeastern sea area of Madura Island, Indonesia, with a design processing scale of 5 million cubic meters per day.
It is jointly completed by a number of professional companies in China.
The design standards are high and the construction period is tight
.
The Engineering Institute of Shanghai Offshore Oil Bureau undertakes the entire process of TEG module services, including technical support for design, procurement, transportation and construction
After the project won the bid, Shanghai Offshore Oil Bureau established a project design team with the chief expert and the deputy chief engineer of the Academy of Engineering as the check, the design manager is specifically responsible, and the technical personnel of the Academy of Engineering as the main body.
To tackle technical problems, implement management systems such as four-level review system and task-to-point system to ensure the progress of project design and the quality of results
.
Up to now, the project team has completed the submission of the "standard 0 version" design report and drawings