Categories
-
Pharmaceutical Intermediates
-
Active Pharmaceutical Ingredients
-
Food Additives
- Industrial Coatings
- Agrochemicals
- Dyes and Pigments
- Surfactant
- Flavors and Fragrances
- Chemical Reagents
- Catalyst and Auxiliary
- Natural Products
- Inorganic Chemistry
-
Organic Chemistry
-
Biochemical Engineering
- Analytical Chemistry
-
Cosmetic Ingredient
- Water Treatment Chemical
-
Pharmaceutical Intermediates
Promotion
ECHEMI Mall
Wholesale
Weekly Price
Exhibition
News
-
Trade Service
Sinopec News Network reported on June 27 that the reaction effluent contact cooler was smoothly hoisted in place in the civil and installation engineering reaction effluent compressor device of the first tender section of the Serbon Phase II propane industrial chain project undertaken by the Ten Construction Company
.
So far, the two coolers have all been hoisted
.
It is understood that the equipment has a diameter of 9.
5 meters, a height of 34.
89 meters, a lifting weight of 410 tons, and a full volume of 1,769 cubic meters.
It uses a 650-ton crawler crane for hoisting operations and a 450-ton crawler crane for sliding tail operations
.
Before hoisting, hoisting operators conduct special inspections on the balance beams and shackles in the hoisting rigging.
After the safety technical disclosure is completed, the hoisting officially begins
.
The two crawler cranes jointly lift the equipment slowly.
After the commander checks the force, when the bottom of the equipment is higher than the saddle of the equipment, the two crawler cranes cooperate to gradually erect the equipment
After all parties confirmed that it was correct, the reaction effluent contacting the cooler was installed
.
So far, the two coolers in the reaction effluent compressor device have all been hoisted
.