-
Categories
-
Pharmaceutical Intermediates
-
Active Pharmaceutical Ingredients
-
Food Additives
- Industrial Coatings
- Agrochemicals
- Dyes and Pigments
- Surfactant
- Flavors and Fragrances
- Chemical Reagents
- Catalyst and Auxiliary
- Natural Products
- Inorganic Chemistry
-
Organic Chemistry
-
Biochemical Engineering
- Analytical Chemistry
-
Cosmetic Ingredient
- Water Treatment Chemical
-
Pharmaceutical Intermediates
Promotion
ECHEMI Mall
Wholesale
Weekly Price
Exhibition
News
-
Trade Service
Original title: The 3060 series offshore wind power installation platform project was signed in Yantai to help China's offshore wind power development
The "3060 Series Offshore Wind Power Installation Platform" project was signed in Yantai, Shandong on the 17th.
Chinanews.
The project is led by the three parties of Huadian Heavy Industry Co.
The first platform was independently designed and built by CIMC Raffles, equipped with a 2200T pile-around offshore crane and a rack-and-pinion lifting system; the leg length is 120 meters (which can be extended to 136 meters), which can meet the 65-meter operating water depth and DP2 Dynamic positioning and other requirements; design standards meet the requirements of operations in the waters of China, the North Sea of Europe, and Southeast Asia.
On the same day, the leader of the project also formally launched the "Green Practitioner" initiative, inviting upstream and downstream partners in the offshore wind power industry chain to join in, proposing to jointly build a joint organization oriented to "offshore wind power per kilowatt-hour cost" and jointly launch diversification The integrated solution of offshore wind level price.
It is reported that, driven by the goal of "carbon peak in 2030 and carbon neutral by 2060", offshore wind power is one of China's important clean energy sources, and its large-scale development has an important impact on the realization of this goal.