echemi logo
Product
  • Product
  • Supplier
  • Inquiry
    Home > Chemicals Industry > Rubber Plastic News > Tenth China-Korea Petrochemical Project's new ethylene cracking furnace resumes work

    Tenth China-Korea Petrochemical Project's new ethylene cracking furnace resumes work

    • Last Update: 2022-08-23
    • Source: Internet
    • Author: User
    Search more information of high quality chemicals, good prices and reliable suppliers, visit www.echemi.com

    On April 14th, the No.
    10 200,000-ton/year cracking furnace of the Sino-Korea (Wuhan) Petrochemical Project's ethylene plant, which was constructed by the Tenth Construction Company of Refining and Chemical Engineering, was successfully resumed, marking the start of the Sino-Korea Petrochemical ethylene de-bottleneck reconstruction project.
    "Fast Lane"


    .


    In the face of the impact of the epidemic, the Sino-Korean Petrochemical Engineering Project Department of the Tenth Construction Company has established a strong epidemic prevention organization system, formulated careful isolation and prevention and control measures, fully implemented logistics and epidemic prevention material support, and carefully coordinated the allocation of resources to ensure that the new No.
    10 After the cracking furnace resumed work, construction tasks such as lining, steel structure, and hoisting of convection section modules were carried out in an orderly manner as planned


    .


    During the resumption of the project, the on-site construction workers wore masks in strict accordance with the requirements and replaced them in time, and actively accepted temperature measurement, registration and filing at the entry and exit operation level, and the project department implemented closed management of the construction site to ensure that personnel movements were recorded at all times


    .


    It is understood that Sino-Korean Petrochemical's newly added No.
    10 cracking furnace is a double-chamber liquid furnace, which has the function of split furnace coking and is designed with Sinopec's CBL technology


    .


    At present, the project department will closely focus on the action goal of "100-day tackling difficulties and creating efficiency", with the work orientation of "management innovation and work efficiency improvement", and continuously optimize and improve the construction organization planning of various specialties, and accelerate the promotion of Sino-Korea Petrochemical's new cracking furnaces and new poly The construction process of projects such as propylene and ethylene de-bottleneck transformation has made every effort to win the "double victory" of epidemic prevention and control and tackling difficulties and creating benefits, laying a solid foundation for realizing the goal of improving project operation quality and efficiency


    .


    This article is an English version of an article which is originally in the Chinese language on echemi.com and is provided for information purposes only. This website makes no representation or warranty of any kind, either expressed or implied, as to the accuracy, completeness ownership or reliability of the article or any translations thereof. If you have any concerns or complaints relating to the article, please send an email, providing a detailed description of the concern or complaint, to service@echemi.com. A staff member will contact you within 5 working days. Once verified, infringing content will be removed immediately.

    Contact Us

    The source of this page with content of products and services is from Internet, which doesn't represent ECHEMI's opinion. If you have any queries, please write to service@echemi.com. It will be replied within 5 days.

    Moreover, if you find any instances of plagiarism from the page, please send email to service@echemi.com with relevant evidence.