-
Categories
-
Pharmaceutical Intermediates
-
Active Pharmaceutical Ingredients
-
Food Additives
- Industrial Coatings
- Agrochemicals
- Dyes and Pigments
- Surfactant
- Flavors and Fragrances
- Chemical Reagents
- Catalyst and Auxiliary
- Natural Products
- Inorganic Chemistry
-
Organic Chemistry
-
Biochemical Engineering
- Analytical Chemistry
-
Cosmetic Ingredient
- Water Treatment Chemical
-
Pharmaceutical Intermediates
Promotion
ECHEMI Mall
Wholesale
Weekly Price
Exhibition
News
-
Trade Service
At 10:18 a.
m.
on September 30, at the site of the third phase of the Taixing Meilan New Materials Co.
, Ltd.
, the groundbreaking ceremony
of the third phase of the fluorine-containing new material technology transformation project of Taixing Meilan New Materials Co.
, Ltd.
was grandly held.
Present at the groundbreaking ceremony were the leaders of Meixin Company, members of the third phase project team, representatives of the site of the 16th Chemical Construction, engineering personnel and supervision representatives
.
At the ceremony site, Yang Chengkun, project manager of the third phase of the 16th Chemical Construction, spoke
first.
He said that at present, the construction management personnel allocated by the project department have basically arrived at the post, the project safety production management system and responsibility system have been established and implemented, and the temporary facilities and temporary roads at the construction site have been basically arranged
.
The technical preparations before the start of construction, the personnel, materials, machinery and equipment required in the early stage of construction have reached the requirements of the start of
construction.
The project department will strictly implement the company's management policy, strictly implement the current safety production, civilized construction management norms, and always adhere to the "safe production, prevention first" management policy
.
In terms of quality management, the use of scientific management methods, combined with the actual situation of the project, the establishment of a strong construction management quality assurance system, the implementation of quality assurance measures, so that the project quality is always in a controlled state, to ensure the realization
of the project quality objectives.
Qian Houqin, vice chairman of Meixin Company and general conductor of the third phase of the project, spoke
at the meeting.
First of all, on behalf of Meixin Company and all the staff of the project team of the Engineering Department, she warmly congratulated
the start of the project.
She hoped that the 16th Chemical Construction Co.
, Ltd.
coordinated with the project teams, construction and supervision, meticulously organized, scientifically managed and reasonably arranged, and rationally optimized the four substantive contents
with safety, quality and construction period as the goals.
Meixin company will adhere to the "safety foundation core", "quality is more important than Taishan" purpose, with the actual service concept, modest work style, abide by professional ethics, improve work efficiency, adhere to the scientific nature of construction standards, with high quality, high speed, high efficiency to achieve the best benefits
of the project.
At the same time, we also hope that all participating and supervising companies will fully support the construction of this project and ensure that the project is completed
as soon as possible.
Finally, Wei Shenghong, the representative of the supervision company, made a statement
.
He said that it will closely focus on the construction goals of the project, strictly follow the design and specification requirements, firmly establish the quality awareness, quality awareness, and strive to do a good job in quality control, progress control, investment control, perform safety management duties, do a good job in related coordination work, strive to create excellent projects, under the premise of ensuring the quality of the project, accelerate the progress of the project, improve investment efficiency, in order to build first-class projects, implement first-class management, create first-class performance, and return the trust
of owners.