-
Categories
-
Pharmaceutical Intermediates
-
Active Pharmaceutical Ingredients
-
Food Additives
- Industrial Coatings
- Agrochemicals
- Dyes and Pigments
- Surfactant
- Flavors and Fragrances
- Chemical Reagents
- Catalyst and Auxiliary
- Natural Products
- Inorganic Chemistry
-
Organic Chemistry
-
Biochemical Engineering
- Analytical Chemistry
-
Cosmetic Ingredient
- Water Treatment Chemical
-
Pharmaceutical Intermediates
Promotion
ECHEMI Mall
Wholesale
Weekly Price
Exhibition
News
-
Trade Service
Sinopec News Network News Since 2021, Tahe Refining and Petrochemical Division II has focused on the "four grasps" production policy of "improving ideological construction, grasping equipment management, grasping process optimization, and grasping on-site implementation" to promote high-quality production of equipment and achieve significant results
.
Pay attention to ideological construction and build the cornerstone of safety
.
"Thoughts govern action, and attitude determines everything
Pay attention to equipment management to eliminate hidden defects
.
In order to pay close attention to equipment management and eliminate hidden dangers in the budding state, each device of the operation department conducts a routine test on the standby pump once a month, and keeps relevant records of the test time, pump location number, and whether there are problems.
A few days ago, in order to cope with the high temperature in summer, each device has strengthened the frequency of patrol inspections of key equipment, increased the inspection of the cooling and lubrication systems of large-scale units, and prevented equipment from high temperature failures; organized various teams to regularly relieve pressure on the deactivated pipelines in the area , To prevent high-temperature oil vaporization from causing flange holding pressure leakage, causing fire accidents; assigning a vernier caliper to the team to check the flange gap, to ensure the quality of flange fastening, and to greatly improve the on-site standardization and leakage problems
.
Focus on process optimization and promote quality and efficiency improvement
.
In order to reduce the production cost of the device, the operation department reorganized the jet fuel device to actively carry out the "I diagnose for the operation method".
According to temperature changes, adjust the amount of air-cooled spray water in a timely manner to reduce the use of circulating water; the temperature of the bottom of the hydroisomerized liquefied gas stripping tower is reduced by 5℃ compared with the previous control temperature, so that the low-pressure steam consumption of the bottom reboiler The output is reduced by 30 kilograms per hour; the continuous reforming hydrogen delivery pressure is reduced by 0.
1 MPa, which reduces the operating current of the reforming booster C202 by 4A, which can save more than 15,000 yuan in production costs per month; the team regularly conducts anti-extinguishing furnace operations to ensure No fluctuations in production due to the liquid in the fuel gas
.
Pay attention to on-site implementation to ensure stable production
.
In order to strictly implement the on-site implementation, the operation department continued to promote the "five checks and five strict" and "finger verbal" work into the site to improve the operation level of employees from actual work