    Sinopec News Network News Since the flood season, heavy rainfall, thunder and lightning, strong winds and other severe weather have appeared in many places.
    In order to ensure the stability of plant production, the Public Works Operations Department of Tahe Refining and Chemical Company formulated scientific and effective protective management measures in time to strengthen Safe production of dams during the rainy season to ensure the smooth operation of equipment production
    .

    Strengthen traffic safety management
    .


    Based on the principles of early deployment, early planning, and early planning, the operation department will follow up and manage the changes in the weather, further strengthen safety warning education, and ensure that employees are ideologically firm in the safety red line.


    Strengthen equipment maintenance
    .


    Increase on-site emergency lighting facilities; replace aging grounding wires, and continue to investigate other grounding wires; dredge trenches, adjust upstream drainage, control the flow of circulating water backwashing and sewage discharge; make asphalt waterproofing for leaks in the house; check on-site cables Slot box to prevent fire fighting water from flowing into the cable trench when the pump is overhauled


    Strengthen the investigation of potential safety hazards
    .


    The operation department strengthens the investigation and rectification of hidden dangers to ensure that various safety precautions are in place, and regularly inspect power transmission lines and facilities to ensure that there are no constructions around the lines and no trees blocking the lines; process adjustment sewage adjustment tanks and accident pools are at a low level Operation, leaving room for emergency; according to weather changes, do a good job tracking management work, abnormal weather conditions promptly notify to stop on-site construction operations


    Strengthen production emergency management
    .


    Improve the emergency management responsibility system, improve the overall implementation capability, formulate the "Emergency Plan for Abnormal Power Shutdown and Drift", and issue the "Emergency Drill Plan for Power Drifting in Extreme Thunderstorms"


    (Peng Shiqi)

    This article is an English version of an article which is originally in the Chinese language on echemi.com and is provided for information purposes only. This website makes no representation or warranty of any kind, either expressed or implied, as to the accuracy, completeness ownership or reliability of the article or any translations thereof. If you have any concerns or complaints relating to the article, please send an email, providing a detailed description of the concern or complaint, to service@echemi.com. A staff member will contact you within 5 working days. Once verified, infringing content will be removed immediately.

    Contact Us

    The source of this page with content of products and services is from Internet, which doesn't represent ECHEMI's opinion. If you have any queries, please write to service@echemi.com. It will be replied within 5 days.

    Moreover, if you find any instances of plagiarism from the page, please send email to service@echemi.com with relevant evidence.