Categories
-
Pharmaceutical Intermediates
-
Active Pharmaceutical Ingredients
-
Food Additives
- Industrial Coatings
- Agrochemicals
- Dyes and Pigments
- Surfactant
- Flavors and Fragrances
- Chemical Reagents
- Catalyst and Auxiliary
- Natural Products
- Inorganic Chemistry
-
Organic Chemistry
-
Biochemical Engineering
- Analytical Chemistry
-
Cosmetic Ingredient
- Water Treatment Chemical
-
Pharmaceutical Intermediates
Promotion
ECHEMI Mall
Wholesale
Weekly Price
Exhibition
News
-
Trade Service
On May 31, a new member of the global dam "family" was added, and the Jinsha River Baihetan Hydropower Station Project Dam was poured to the top, and the first batch of units is scheduled to be put into operation in
July this year.
As the world's largest giant hydropower station under construction and the most difficult to comprehensively integrate, the Baihetan Hydropower Dam set six world records
during its construction.
The construction of the project involves hydropower design, major equipment manufacturing, construction management and many other industrial fields, highlighting the advantages of China's complete industrial chain in the construction of heavy weapons and super projects in large countries, and is a new "national business card"
of China's hydropower after the Three Gorges Project.
Far East Cable lays cables for deep shafts of dams independently developed and designed by Baihetan Hydropower Station, and provides targeted overall hanging laying schemes, which plays an important role
in transmitting electricity to the pumps of the seepage and drainage system of Baihetan Hydropower Station dams and water mats.
Far East Cable Technology R&D service team conducted technical exchanges on site
It is understood that in order to ensure the safe and stable operation of Baihetan Hydropower Station, the scientific research and technical team of Far East Cable has conducted many field investigations and investigations, designed a new cable structure and special supporting bearing spreader for the shaft pipeline structure and arrangement of Baihetan Hydropower Station Dam and Erdaobadam, and formulated the overall arrangement of hanging cable and spreader design scheme
.
The new hanging cable and load-bearing spreader not only adapt to the installation and use environment of small area cable shaft, but also have the advantages of reliable overall tensile strength, but also have excellent flame retardant performance
.
From Shanghai World Financial Center, China Zun to Baihetan Hydropower Station, Far East has promoted the intelligent development of super-high-rise buildings with outstanding advantages, led major changes in the way of super-high-rise power supply through innovation, and demonstrated an industry-leading image
in terms of technical strength and ultimate service.
(Jang Jingjing)
On May 31, a new member of the global dam "family" was added, and the Jinsha River Baihetan Hydropower Station Project Dam was poured to the top, and the first batch of units is scheduled to be put into operation in
July this year.
As the world's largest giant hydropower station under construction and the most difficult to comprehensively integrate, the Baihetan Hydropower Dam set six world records
during its construction.
The construction of the project involves hydropower design, major equipment manufacturing, construction management and many other industrial fields, highlighting the advantages of China's complete industrial chain in the construction of heavy weapons and super projects in large countries, and is a new "national business card"
of China's hydropower after the Three Gorges Project.
Far East Cable lays cables for deep shafts of dams independently developed and designed by Baihetan Hydropower Station, and provides targeted overall hanging laying schemes, which plays an important role
in transmitting electricity to the pumps of the seepage and drainage system of Baihetan Hydropower Station dams and water mats.
Far East Cable Technology R&D service team conducted technical exchanges on site
It is understood that in order to ensure the safe and stable operation of Baihetan Hydropower Station, the scientific research and technical team of Far East Cable has conducted many field investigations and investigations, designed a new cable structure and special supporting bearing spreader for the shaft pipeline structure and arrangement of Baihetan Hydropower Station Dam and Erdaobadam, and formulated the overall arrangement of hanging cable and spreader design scheme
.
The new hanging cable and load-bearing spreader not only adapt to the installation and use environment of small area cable shaft, but also have the advantages of reliable overall tensile strength, but also have excellent flame retardant performance
.
From Shanghai World Financial Center, China Zun to Baihetan Hydropower Station, Far East has promoted the intelligent development of super-high-rise buildings with outstanding advantages, led major changes in the way of super-high-rise power supply through innovation, and demonstrated an industry-leading image
in terms of technical strength and ultimate service.
(Jang Jingjing)