-
Categories
-
Pharmaceutical Intermediates
-
Active Pharmaceutical Ingredients
-
Food Additives
- Industrial Coatings
- Agrochemicals
- Dyes and Pigments
- Surfactant
- Flavors and Fragrances
- Chemical Reagents
- Catalyst and Auxiliary
- Natural Products
- Inorganic Chemistry
-
Organic Chemistry
-
Biochemical Engineering
- Analytical Chemistry
-
Cosmetic Ingredient
- Water Treatment Chemical
-
Pharmaceutical Intermediates
Promotion
ECHEMI Mall
Wholesale
Weekly Price
Exhibition
News
-
Trade Service
On April 8, the reporter learned from the Sinopec Information Office that the Sinopec ethylene de-bottleneck reconstruction project resumed work, and the ethylene production load increased from 80% during the epidemic to 100%.
Since then, China and South Korea, which are located in the national epidemic prevention and control center Petrochemical fully resumed work and production
.
This move is an important measure for Sino-Korea Petrochemical to implement a hundred days of tackling difficulties and creating results
.
In order to resume work of the renovation project as soon as possible, starting in mid-March, Sino-Korea Petrochemical Co.
, Ltd.
, together with the Fourth Construction Company and the Tenth Construction Company, coordinated the review procedures for the reworkers, and took epidemic prevention measures such as isolation and nucleic acid testing
.
Although it is located in Wuhan, Sino-Korea Petrochemical's production did not stop for a day during the epidemic.
The cadres and employees of the company overcame many difficulties, focusing on epidemic prevention on one hand and ensuring supply on the other
.