-
Categories
-
Pharmaceutical Intermediates
-
Active Pharmaceutical Ingredients
-
Food Additives
- Industrial Coatings
- Agrochemicals
- Dyes and Pigments
- Surfactant
- Flavors and Fragrances
- Chemical Reagents
- Catalyst and Auxiliary
- Natural Products
- Inorganic Chemistry
-
Organic Chemistry
-
Biochemical Engineering
- Analytical Chemistry
-
Cosmetic Ingredient
- Water Treatment Chemical
-
Pharmaceutical Intermediates
Promotion
ECHEMI Mall
Wholesale
Weekly Price
Exhibition
News
-
Trade Service
At 16:00 on January 20, as ethylene oxide was transported to Aoke Chemical Company, a downstream enterprise in Wuhan Chemical Industry Zone, it marked the successful operation of the Sino-Korea Petrochemical ethylene oxide pipeline transportation project
.
At present, the marginal benefit of the ethylene oxide market is the best, and increasing the production of ethylene oxide has become an important benefit growth point for Sino-Korea Petrochemicals
.
At present, the marginal benefit of the ethylene oxide market is the best, and increasing the production of ethylene oxide has become an important benefit growth point for Sino-Korea Petrochemicals
.
To this end, the company carried out a feasibility study to determine that ethylene oxide pipeline transportation to downstream enterprises would be the best choice, and actively carried out technical transformation of equipment and laying of downstream pipelines
.
In January this year, the Epoxy Aromatics Department successively completed the preliminary preparations for the new long-distance ethylene oxide pipeline, such as pickling, ball passing, drying, and air tightness, and successfully introduced ethylene oxide into the external circulation pipeline
.
In order to ensure the smooth progress of the pipeline transportation, the company has specially assigned personnel to follow up, calibrate the measuring instruments, increase the patrol inspection of the ethylene oxide long-distance pipeline, and monitor the whole process of commissioning, which ensures the successful commissioning of the pipeline transportation project at one time, and alleviates the environmental problems.
The pressure of oxyethane loading and leaving the factory also creates conditions for increasing production capacity
.