-
Categories
-
Pharmaceutical Intermediates
-
Active Pharmaceutical Ingredients
-
Food Additives
- Industrial Coatings
- Agrochemicals
- Dyes and Pigments
- Surfactant
- Flavors and Fragrances
- Chemical Reagents
- Catalyst and Auxiliary
- Natural Products
- Inorganic Chemistry
-
Organic Chemistry
-
Biochemical Engineering
- Analytical Chemistry
-
Cosmetic Ingredient
- Water Treatment Chemical
-
Pharmaceutical Intermediates
Promotion
ECHEMI Mall
Wholesale
Weekly Price
Exhibition
News
-
Trade Service
Since the beginning of summer this year, many places in Sichuan Province have continued to have high temperatures, and the highest temperature in Chengdu even reached 43.
4 degrees
.
The highest load of electricity demand in the province jumped to 65 million kilowatts, a year-on-year increase of 25%.
In order to help power supply and alleviate the shortage of electricity consumption, about 5,000 (solar power generation) photovoltaic modules of the "Panda Expressway" highway (Sichuan section) connecting Panzhihua, Sichuan and Dali, Yunnan Province were officially put into full use on the 24th, with an estimated annual average power generation of 4.
22 million kWh
.
With the help of photovoltaic power generation, the 41-kilometer section of the Panda Expressway (Sichuan section) has been completely self-sufficient in clean energy, and another 80% of the electricity is directly transmitted to the national grid
.
Since the beginning of summer this year, many places in Sichuan Province have continued to have high temperatures, and the highest temperature in Chengdu even reached 43.
4 degrees
.
The highest load of electricity demand in the province jumped to 65 million kilowatts, a year-on-year increase of 25%.
In order to help power supply and alleviate the shortage of electricity consumption, about 5,000 (solar power generation) photovoltaic modules of the "Panda Expressway" highway (Sichuan section) connecting Panzhihua, Sichuan and Dali, Yunnan Province were officially put into full use on the 24th, with an estimated annual average power generation of 4.
22 million kWh
.
With the help of photovoltaic power generation, the 41-kilometer section of the Panda Expressway (Sichuan section) has been completely self-sufficient in clean energy, and another 80% of the electricity is directly transmitted to the national grid
.