echemi logo
Product
  • Product
  • Supplier
  • Inquiry
    Home > Chemicals Industry > Petrochemical News > Shengli Oilfield Heavy Oil Cold Production National Key Project Obtained Phase Results

    Shengli Oilfield Heavy Oil Cold Production National Key Project Obtained Phase Results

    • Last Update: 2021-09-04
    • Source: Internet
    • Author: User
    Search more information of high quality chemicals, good prices and reliable suppliers, visit www.echemi.com

    Sinopec News Network recently, the national key research and development plan led by Shengli Oilfield "basic research and industrial demonstration of heavy oil chemical composite cold production" project mid-term summary video conference was held
    .


    It is reported that this five-year research project has just passed halfway and has achieved fruitful results


    China’s heavy oil reserves are 4 billion tons, and the thermal recovery produces about 15 million tons of oil annually.
    The steam huff and puff is the main method, and the recovery rate is less than 20%.
    In order to achieve energy security, technological changes are urgently needed.
    Oil displacement is the fundamental way to realize the above-mentioned transformation
    .


    The research period of "Basic Research and Industrial Demonstration of Heavy Oil Chemical Composite Cold Recovery" is from 2019 to 2024, and strives to pass five years of research to form the key technology of heavy oil chemical composite cold recovery and flooding, and realize heavy oil recovery from thermal recovery and heating.


    The project has set up five subjects in total.
    Among them, the subject five "Heavy Oil Chemical Combination Flooding Cold Recovery Industrial Demonstration Application" undertaken by Shengli Oilfield is an integrated application of the research results of subjects one to four, and its research and completion are of great significance
    .


    In the two years since the project was launched, more than 1,000 sets of indoor experiments and nearly 200 sets of reservoir numerical simulation program studies have been carried out, and the preparation of 3 demonstration zones has been completed, and the 12 special tasks stipulated in the contract have been exceeded


    It is understood that the ultimate goal of the project is to build 2 industrial application demonstration zones, increase the recovery rate by more than 5 percentage points, and balance the oil price within US$50/barrel


    (Ren Houyi and Tong Tong)

    This article is an English version of an article which is originally in the Chinese language on echemi.com and is provided for information purposes only. This website makes no representation or warranty of any kind, either expressed or implied, as to the accuracy, completeness ownership or reliability of the article or any translations thereof. If you have any concerns or complaints relating to the article, please send an email, providing a detailed description of the concern or complaint, to service@echemi.com. A staff member will contact you within 5 working days. Once verified, infringing content will be removed immediately.

    Contact Us

    The source of this page with content of products and services is from Internet, which doesn't represent ECHEMI's opinion. If you have any queries, please write to service@echemi.com. It will be replied within 5 days.

    Moreover, if you find any instances of plagiarism from the page, please send email to service@echemi.com with relevant evidence.