echemi logo
Product
  • Product
  • Supplier
  • Inquiry
    Home > Chemicals Industry > Petrochemical News > Shengli Offshore Chengbei 6E-1 well completed operation and started production

    Shengli Offshore Chengbei 6E-1 well completed operation and started production

    • Last Update: 2021-09-04
    • Source: Internet
    • Author: User
    Search more information of high quality chemicals, good prices and reliable suppliers, visit www.echemi.com

    Recently, Shengli Offshore Chengbei 6E-1 well completed the operation and opened the well
    .

    Chengbei 6E-1 well is located on the Chengbei 6E platform on the sea, about 15 kilometers away from the shore.
    It is an oil well in the upper strata and has considerable historical production
    .


    The formation of this well is blocked, with bottom water in the lower layer and high shale content.


    In view of the actual situation in the well, Shengli Operation No.
    5 Platform of the Marine Trial Repair Engineering Department of Shengli Downhole Operation Company responsible for this construction has repeatedly demonstrated and determined that the upper layer of sandstone is acid-blocked and the lower layer is not treated to optimize the removal of plugging without drawing filtration.
    The plan idea of ​​processing radius and construction parameters is to complete the well with the electric pump according to the geological production allocation, adjust the position of the pump, and go down the well with sensors
    .


    Optimize production and development at the initial stage of well opening, control production pressure difference, and ensure long-term operation results


    In the face of difficulties in construction, the platforms are arranged in an overall plan, rationally arranged, and construction measures are optimized
    .


    At the same time, strengthen quality process control during construction, strictly prevent formation leakage, strictly implement the dispatch system, and pay attention to the overall supervision of the construction operation, safety behavior, and construction evaluation of the on-site cooperative contractor, which effectively guarantees the high-quality, high-efficiency, and low-consumption completion of the well.


    This article is an English version of an article which is originally in the Chinese language on echemi.com and is provided for information purposes only. This website makes no representation or warranty of any kind, either expressed or implied, as to the accuracy, completeness ownership or reliability of the article or any translations thereof. If you have any concerns or complaints relating to the article, please send an email, providing a detailed description of the concern or complaint, to service@echemi.com. A staff member will contact you within 5 working days. Once verified, infringing content will be removed immediately.

    Contact Us

    The source of this page with content of products and services is from Internet, which doesn't represent ECHEMI's opinion. If you have any queries, please write to service@echemi.com. It will be replied within 5 days.

    Moreover, if you find any instances of plagiarism from the page, please send email to service@echemi.com with relevant evidence.