-
Categories
-
Pharmaceutical Intermediates
-
Active Pharmaceutical Ingredients
-
Food Additives
- Industrial Coatings
- Agrochemicals
- Dyes and Pigments
- Surfactant
- Flavors and Fragrances
- Chemical Reagents
- Catalyst and Auxiliary
- Natural Products
- Inorganic Chemistry
-
Organic Chemistry
-
Biochemical Engineering
- Analytical Chemistry
-
Cosmetic Ingredient
- Water Treatment Chemical
-
Pharmaceutical Intermediates
Promotion
ECHEMI Mall
Wholesale
Weekly Price
Exhibition
News
-
Trade Service
On the 12th, on the sea 30 kilometers away from the coastline of Haiyang, Shandong, as the 5 wind turbines of the 10th loop of the Shandong Peninsula South 4 offshore wind power project began to operate, Shandong’s first offshore wind farm was successfully connected to the grid for power generation, achieving a “zero breakthrough in offshore wind power” "
.
It is understood that the Shandong Peninsula South 4 offshore wind power project is the first batch of offshore wind power demonstration projects in Shandong Province, with a total installed capacity of 301.
6 MW
According to the relevant person in charge of State Grid Shandong Electric Power, by the end of December, 58 wind turbines of Shandong Peninsula South 4 offshore wind power will be connected to the grid with full capacity, which will promote the transformation and upgrading of Shandong’s energy structure and accelerate the realization of "carbon peak and carbon neutrality.
" The goal is positive