echemi logo
Product
  • Product
  • Supplier
  • Inquiry
    Home > Chemicals Industry > Rubber Plastic News > ROHM Chemical Reconstruction and Expansion Project was approved; including MMA, PMMA and other devices

    ROHM Chemical Reconstruction and Expansion Project was approved; including MMA, PMMA and other devices

    • Last Update: 2022-09-24
    • Source: Internet
    • Author: User
    Search more information of high quality chemicals, good prices and reliable suppliers, visit www.echemi.com

    On February 21, the Shanghai Municipal Bureau of Ecology and Environment announced the proposed approval for the renovation and expansion project of ROHM Chemicals (Shanghai) Co.


    In response to changes in the raw material and product market, ROHM Chemicals plans to carry out technical transformation or capacity expansion through multiple sets of devices throughout the project


    The following are the main contents of the construction of the project:

    (1) MMA plant raw material diversification project (MMA plant technical transformation): Utilize the surplus of the existing MMA production equipment double refining tower, rectify the purchased MMA, in order to achieve the purpose of producing MMA products through different raw materials


    (2) Product upgrading and transformation project of methacrylate special monomer factory (BUMA device technical transformation): the existing BUMA device will be transformed to increase its function of producing new product EHMA


    (3) Three-line project of polymethyl methacrylate production unit (KP3 line): On the basis of the existing two PMMA production lines, a new PMMA production line, namely KP3 line, will be built, with a designed capacity of 20,000t/a


    (4) Converting the polymethyl methacrylate coloring test line to a formal production line (PICOC line expansion): Convert the existing PICOC line of a PMMA coloring test line in the PC unit to a formal production line, and the annual operating time will be extended to 8500h/a ( Among them, 288h is the cleaning time) to achieve capacity expansion


    This reconstruction and expansion project mainly uses the existing technology, no new technology is added, the environmental protection project should rely on or copy the existing environmental protection facilities, and the public and auxiliary projects basically rely on the existing ones


    The total investment of the project is 243.


    This article is an English version of an article which is originally in the Chinese language on echemi.com and is provided for information purposes only. This website makes no representation or warranty of any kind, either expressed or implied, as to the accuracy, completeness ownership or reliability of the article or any translations thereof. If you have any concerns or complaints relating to the article, please send an email, providing a detailed description of the concern or complaint, to service@echemi.com. A staff member will contact you within 5 working days. Once verified, infringing content will be removed immediately.

    Contact Us

    The source of this page with content of products and services is from Internet, which doesn't represent ECHEMI's opinion. If you have any queries, please write to service@echemi.com. It will be replied within 5 days.

    Moreover, if you find any instances of plagiarism from the page, please send email to service@echemi.com with relevant evidence.