-
Categories
-
Pharmaceutical Intermediates
-
Active Pharmaceutical Ingredients
-
Food Additives
- Industrial Coatings
- Agrochemicals
- Dyes and Pigments
- Surfactant
- Flavors and Fragrances
- Chemical Reagents
- Catalyst and Auxiliary
- Natural Products
- Inorganic Chemistry
-
Organic Chemistry
-
Biochemical Engineering
- Analytical Chemistry
-
Cosmetic Ingredient
- Water Treatment Chemical
-
Pharmaceutical Intermediates
Promotion
ECHEMI Mall
Wholesale
Weekly Price
Exhibition
News
-
Trade Service
On June 5, on the avenue in front of the natural gas purification plant of the Puguang branch of Sinopec Zhongyuan Oilfield, dozens of liquid sulfur tankers lined up in a long queue waiting to be loaded, and a special sulfur train drove into the natural gas purification plant Puguang Station
.
After more than 20 days, the shipment and export of sulfur from the Puguang Gas Field have reappeared
.
So far, the plant has been shut down for maintenance since late May and has resumed production as scheduled
.
Li Yongsheng, the director of the factory, said that at present, liquid sulfur and solid sulfur "double-fisted products", trains, liquid sulfur tankers, and bulk vehicles "three-line sales" mode are fully powered, and the average daily loading of sulfur is more than 3,000 tons.
It provides a guarantee for stabilizing the domestic sulfur market price and promoting regional economic and social development
.
The liquid sulfur users of Puguang Branch are mainly Wengfu Dazhou Company, an agricultural and chemical fertilizer enterprise in Dazhou City
.
During the period when the gas field was shut down for technical renovation and maintenance, the sulfur inventory was in a hurry
.
To this end, the natural gas purification plant went all out to ensure the resumption of production.
After the completion of the technical renovation and maintenance, the natural gas purification plant quickly organized forces to carry out the preparation of the resumption process and confirmation of the conditions, inspected and tested in advance, unblocked the liquid sulfur pipeline network, and opened the sulfur molding machine on June 2.
The successful resumption of production laid a solid foundation for the successful resumption of production of sulfur loading vehicles
.