-
Categories
-
Pharmaceutical Intermediates
-
Active Pharmaceutical Ingredients
-
Food Additives
- Industrial Coatings
- Agrochemicals
- Dyes and Pigments
- Surfactant
- Flavors and Fragrances
- Chemical Reagents
- Catalyst and Auxiliary
- Natural Products
- Inorganic Chemistry
-
Organic Chemistry
-
Biochemical Engineering
- Analytical Chemistry
-
Cosmetic Ingredient
- Water Treatment Chemical
-
Pharmaceutical Intermediates
Promotion
ECHEMI Mall
Wholesale
Weekly Price
Exhibition
News
-
Trade Service
As of June 30, the Tarim Oilfield has effectively organized the Bozi-Dabei and Fuman oilfields to concentrate production, speeding up the second deepening of the comprehensive treatment of old oil and gas fields.
In the first half of the year, 16.
38 million tons of oil and gas were produced, completing 51.
9% of the annual plan, an increase of 63 10,000 tons, including 3.
194 million tons of petroleum liquids and 16.
55 billion cubic meters of natural gas, achieving the best results in history
.
Since the beginning of the year, the Tarim Oilfield has accurately deployed the "five major strategies", highlighted the concentrated production of the Fuman, Bozi-Dabei blocks, carried out the second comprehensive treatment of old oil and gas fields, and strictly implemented the "monthly protection by ten days, season protection by months," The production plan to guarantee the year by season has laid a solid foundation for the realization of high-quality development and a good start to the "14th Five-Year Plan"
.
Fight the offensive battle for oil and gas exploration
.
Do a good job in the overall evaluation of the Bozi-Dabei block.
A batch of exploratory wells and evaluation wells such as Bozi 17 and Bozi 1202 have obtained high-yield gas flow.
The Bozi-Dabei trillion cubic meters large gas area has basically been implemented, and 19 gas reservoirs have been discovered.
Engineering technology speeds up and improves efficiency
.
Intensify engineering and technical research, and comprehensively promote the mature supporting speed-up technology of “bit selection + tool matching + parameter enhancement”, and the average completion speed is about 5% year-on-year
Firmly establish the concept of operating oil and gas reservoirs
.
Adhere to the integration of exploration and development, accelerate the promotion of the centralized production of Bozi-Dabei and Fuman oilfields, prepare development plans in advance, and strengthen the three-level review of well positions
The second comprehensive treatment of old oil and gas fields taps into the potential
.
All oil and gas production units take up the "microscope" and strive to turn problems into potential, potential into measures, and measures into production
The overhaul of oil and gas equipment is scientific and efficient
.
Adhering to the principle of "inspections should be inspected, efficient organization, safe and stable, and continuous optimization", the total maintenance time of 11 sets of oil and gas processing equipment in the first half of the year was reduced by 51 days compared with the plan, which lessened 19,700 tons of crude oil production and 274 million cubic meters of natural gas production