echemi logo
Product
  • Product
  • Supplier
  • Inquiry
    Home > Chemicals Industry > Petrochemical News > North China Oil and Gas Branch turns waste gas into a treasure to protect the blue sky

    North China Oil and Gas Branch turns waste gas into a treasure to protect the blue sky

    • Last Update: 2021-08-14
    • Source: Internet
    • Author: User
    Search more information of high quality chemicals, good prices and reliable suppliers, visit www.echemi.com

    The loess plateau in the block of the first oil production plant is dry and less rainy, and ecologically fragile.
    Protecting the ecological environment is the primary task and primary responsibility of oilfield development
    .


    In recent years, the No.


    There are 7 oil wells in the HH1054 wellsite of the second oil production management area of ​​the first oil production plant, with a daily oil output of 5.
    08 tons, and the 7 oil wells have different degrees of associated gas surplus.
    Therefore, the management area installed gas generators on the wellsite and supported them.
    The grid-connected and non-connected control system connects the casing gas of 7 oil wells in series, so that the associated gas is collected to the gas generator through the gas distributor and the dryer
    .


    Associated gas "particles return to the warehouse", as the combustion kinetic energy of the gas generator, to ensure the power operation of the entire well site


    After a period of observation, the management area has worked out a set of associated gas utilization rules, and the gas generator can be used for 12 hours every time the casing is held down for 24 hours
    .


    From January to July 2021, the gas generators will operate for a total of 1,670 hours, saving 46,800 kWh of electricity and saving electricity costs of 36,500 yuan


    Associated gas, which has always been regarded as "exhaust gas", has now become a good treasure.
    In the JH17P11 well site of the fourth area of ​​oil production management, equipment operation, oil dehydration, and domestic electricity use all benefit from the associated gas
    .

    Before April 2020, the electricity used for production and life at the well site came from the local rural network, and it often encountered problems such as electric circuit failure caused by wind and rain or maintenance of circuit aging, which caused a lot of inconvenience
    .


    After that, a multi-functional tank was installed at the well site, and part of the separated associated gas was used for boiler heating, heating the oil storage tank coils to speed up crude oil dehydration; the other part was filtered into a two-stage gas bag to be used for gas-fired power generation Machine operation guarantees 24-hour production and life at the well site


      At present, the first oil production plant has installed a total of 18 natural gas generators, the associated gas recycling rate reached 85%, and the annual reduction of exhaust gas emissions was about 10.
    5 million standard cubic meters.
    Associated gas turned waste into treasure, realizing a win-win situation for green production and energy saving
    .


    (Wang Xia)

    This article is an English version of an article which is originally in the Chinese language on echemi.com and is provided for information purposes only. This website makes no representation or warranty of any kind, either expressed or implied, as to the accuracy, completeness ownership or reliability of the article or any translations thereof. If you have any concerns or complaints relating to the article, please send an email, providing a detailed description of the concern or complaint, to service@echemi.com. A staff member will contact you within 5 working days. Once verified, infringing content will be removed immediately.

    Contact Us

    The source of this page with content of products and services is from Internet, which doesn't represent ECHEMI's opinion. If you have any queries, please write to service@echemi.com. It will be replied within 5 days.

    Moreover, if you find any instances of plagiarism from the page, please send email to service@echemi.com with relevant evidence.