-
Categories
-
Pharmaceutical Intermediates
-
Active Pharmaceutical Ingredients
-
Food Additives
- Industrial Coatings
- Agrochemicals
- Dyes and Pigments
- Surfactant
- Flavors and Fragrances
- Chemical Reagents
- Catalyst and Auxiliary
- Natural Products
- Inorganic Chemistry
-
Organic Chemistry
-
Biochemical Engineering
- Analytical Chemistry
-
Cosmetic Ingredient
- Water Treatment Chemical
-
Pharmaceutical Intermediates
Promotion
ECHEMI Mall
Wholesale
Weekly Price
Exhibition
News
-
Trade Service
Nordex Group has again received a high wind power contract in South Africa to install 80 AW125/3150 wind turbines
for the "Garob" and "Copperton" wind power projects.
It is understood that the wind farm "Garob" consists of
46 wind turbines ordered by Enel Green Power.
The second wind farm includes 34 wind turbines for developers and independent power producer Elawan
.
The two wind projects include delivery and installation as well as multi-year service contracts
.
In addition to this, Nordex will build a 100-meter concrete tower nearby, reducing costs and increasing local manufacturing content
.
Nordex SE's Chief Sales Officer said, "South Africa is an important market for us, which is why we are pleased to execute both orders
.
We received orders for the supply of turbines of approximately 400 MW in 2018
.
“
:/, please indicate the source for reprinting)
Nordex Group has again received a high wind power contract in South Africa to install 80 AW125/3150 wind turbines
for the "Garob" and "Copperton" wind power projects.
It is understood that the wind farm "Garob" consists of
46 wind turbines ordered by Enel Green Power.
The second wind farm includes 34 wind turbines for developers and independent power producer Elawan
.
The two wind projects include delivery and installation as well as multi-year service contracts
.
In addition to this, Nordex will build a 100-meter concrete tower nearby, reducing costs and increasing local manufacturing content
.
Nordex SE's Chief Sales Officer said, "South Africa is an important market for us, which is why we are pleased to execute both orders
.
We received orders for the supply of turbines of approximately 400 MW in 2018
.
“
:/, please indicate the source for reprinting)
/