-
Categories
-
Pharmaceutical Intermediates
-
Active Pharmaceutical Ingredients
-
Food Additives
- Industrial Coatings
- Agrochemicals
- Dyes and Pigments
- Surfactant
- Flavors and Fragrances
- Chemical Reagents
- Catalyst and Auxiliary
- Natural Products
- Inorganic Chemistry
-
Organic Chemistry
-
Biochemical Engineering
- Analytical Chemistry
-
Cosmetic Ingredient
- Water Treatment Chemical
-
Pharmaceutical Intermediates
Promotion
ECHEMI Mall
Wholesale
Weekly Price
Exhibition
News
-
Trade Service
Since the beginning of this year, the upgraded version of the plastic restriction order has spawned the demand for degradable plastics such as PBAT, and the project of its raw material BDO has also ushered in a peak.
Since the beginning of this year, the upgraded version of the plastic restriction order has spawned the demand for degradable plastics such as PBAT, and the project of its raw material BDO has also ushered in a peak.
Inner Mongolia 720,000 tons / year BDO projectInner Mongolia 720,000 tons / year BDO project
On April 7 , the "Inner Mongolia Huaheng Energy Technology Co.
On April 7 , the "Inner Mongolia Huaheng Energy Technology Co.
Construction project name and outline Project name: Inner Mongolia Huaheng Energy Technology Co.
The project covers an area of 1,326,500 square meters.
Construction scale and content: Mainly construct 800,000 tons / year acetylene raw material device, 240,000 tons / year acetylene device, 69,000 standard cubic meters / hour natural gas hydrogen production device, 140,000 tons / year formaldehyde device, 720,000 tons / year BDO device , 180,000 tons / year PTMEG device, 60,000 tons / year PBAT device, power workshop ( 4×320t/h pulverized coal boiler, 2×30MW back pressure turbine generator, 1×40MW back pressure turbine generator And 1×20MW air separation air compressor turbine device) and supporting public and auxiliary engineering and environmental protection engineering.
Shanxi 500,000 tons / year BDO projectShanxi 500,000 tons / year BDO project
On April 7 , the Yuanping Economic and Technological Development Zone, Xinzhou, Shanxi Province, and Shanxi Tongde Chemical Co.
On April 7 , the Yuanping Economic and Technological Development Zone, Xinzhou, Shanxi Province, and Shanxi Tongde Chemical Co.
According to reports, the construction scale of the fully biodegradable plastic production project is an annual output of 500,000 tons of thermoplastic biodegradable plastic raw material 1,4- butanediol and 120,000 tons of thermoplastic biodegradable plastic PBAT .
After the project is completed, an output value of 18 billion yuan can be realized .
The project will start construction in the near future and is expected to be put into operation in December 2022 .