echemi logo
Product
  • Product
  • Supplier
  • Inquiry
    Home > Chemicals Industry > Petrochemical News > New technology in Shengli Dongxin operation area revitalizes low-efficiency wells

    New technology in Shengli Dongxin operation area revitalizes low-efficiency wells

    • Last Update: 2021-06-17
    • Source: Internet
    • Author: User
    Search more information of high quality chemicals, good prices and reliable suppliers, visit www.echemi.com

    Recently, the Dongxin operation area of ​​the Shengli Oilfield Downhole Operation Center implemented sand control modification to the Yong 68 Incline 13 Well.
    The daily oil production increased from 0.
    4 tons to the current 8.
    3 tons, which achieved a good increase in production
    .

    The production horizon of Well Yong 68 Incline 13 is Sha 2 6(1), the oil layer depth is 1518-1522.
    5m, the effective perforation thickness is 4.
    5m, the average permeability is 2292md, the shale content is 7.
    3%, and the reservoir physical properties are good
    .


    The well was operated due to insufficient fluid supply.


    Due to the high water cut, the well has been blocked by blasthole construction in the Sha 2 5 (1) well section 1508.
    1-1510.
    1 meters and Sha 2 6 (2) well section 1530-1531 meters
    .


    The risk of conventional high-pressure gravel packing is high and the success rate is low .


      The construction staff actively changed their concepts and refined the sand control plan
    .


    The use of pressure-limiting, small-displacement and high-pressure gravel filling does not break through the high-pressure water layer near the production zone, but can break through the pollution zone near the production zone, thereby greatly reducing flow resistance and increasing oil well productivity.


      In order to ensure the successful implementation of the sand control technology of the well, technicians tracked, monitored and guided the construction throughout the process
    .


    Through analysis of measures, refinement of the plan and on-site supervision, the sand control quality of the well has been improved and the sand control effect has been ensured


      The success of the well has benefited from the active innovation of the construction staff and optimization of the operation technology
    .


    In the next step, construction personnel will continue to strengthen technology promotion in similar reservoirs to provide strong support for improving the quality and efficiency of low-efficiency wells


      (Bi Guoping and Gou Xiufeng)

    This article is an English version of an article which is originally in the Chinese language on echemi.com and is provided for information purposes only. This website makes no representation or warranty of any kind, either expressed or implied, as to the accuracy, completeness ownership or reliability of the article or any translations thereof. If you have any concerns or complaints relating to the article, please send an email, providing a detailed description of the concern or complaint, to service@echemi.com. A staff member will contact you within 5 working days. Once verified, infringing content will be removed immediately.

    Contact Us

    The source of this page with content of products and services is from Internet, which doesn't represent ECHEMI's opinion. If you have any queries, please write to service@echemi.com. It will be replied within 5 days.

    Moreover, if you find any instances of plagiarism from the page, please send email to service@echemi.com with relevant evidence.