echemi logo
Product
  • Product
  • Supplier
  • Inquiry
    Home > Chemicals Industry > China Chemical > My single largest fixed-bed hydrogen peroxide plant was put into operation

    My single largest fixed-bed hydrogen peroxide plant was put into operation

    • Last Update: 2022-08-15
    • Source: Internet
    • Author: User
    Search more information of high quality chemicals, good prices and reliable suppliers, visit www.echemi.com

    On August 18 , news came from Liming Chemical Research and Design Institute .


    On August 18 , news came from Liming Chemical Research and Design Institute .


    Zhang Huiping, Secretary-General of the Peroxide Branch of the China Inorganic Salt Association, said that in recent years, under the leadership of industry leaders such as Liming Institute, the domestic anthraquinone method palladium catalyst fixed-bed hydrogen peroxide production technology has achieved a single set of scale, device efficiency, and cataly.


    According to Dawn Academy of hydrogen peroxide technology development director Zhao Xiaodong introduced, the device is supporting the project caprolactam two-cum-upgrading project, designed annual production capacity of 33 Wandun ( to 25% , 8000 Xiaoshi / annualized .


    The project was 2017 Nian 3 Yue 23 date of conclusion, the same year 4 Yue 18 date of adoption preliminary design revi.


    "The production data shows that the new hydrogen peroxide production process developed by the Liming Institute has obvious advantages in safety control, automation, energy saving, consumption reduction, quality improvement and efficiency improvement, and all indicators of the product are better than national standar.


    According to Zhao Xiaodong, this project is the first project for Liming Institute to enter the field of general engineering contracti.


    The new hydrogen peroxide process of the Liming Institute has been successfully industrially applied for the first time since 201 At present, 23 sets of devices have been promoted and transferred , and 8 sets of devices have been completed and put into production , all of which have reached production standar.
    “In the next step, the Liming Institute will further improve the new hydrogen peroxide process, and launch scientific and technological research on process equipment efficiency, catalyst and working fluid production capacity, so that the process can adapt to different working fluid systems, and will be upgraded to 500,000 tons of super large Scale production capacity is striding forwa.
    " Zhao Xiaodong sa.
    This article is an English version of an article which is originally in the Chinese language on echemi.com and is provided for information purposes only. This website makes no representation or warranty of any kind, either expressed or implied, as to the accuracy, completeness ownership or reliability of the article or any translations thereof. If you have any concerns or complaints relating to the article, please send an email, providing a detailed description of the concern or complaint, to service@echemi.com. A staff member will contact you within 5 working days. Once verified, infringing content will be removed immediately.

    Contact Us

    The source of this page with content of products and services is from Internet, which doesn't represent ECHEMI's opinion. If you have any queries, please write to service@echemi.com. It will be replied within 5 days.

    Moreover, if you find any instances of plagiarism from the page, please send email to service@echemi.com with relevant evidence.