-
Categories
-
Pharmaceutical Intermediates
-
Active Pharmaceutical Ingredients
-
Food Additives
- Industrial Coatings
- Agrochemicals
- Dyes and Pigments
- Surfactant
- Flavors and Fragrances
- Chemical Reagents
- Catalyst and Auxiliary
- Natural Products
- Inorganic Chemistry
-
Organic Chemistry
-
Biochemical Engineering
- Analytical Chemistry
-
Cosmetic Ingredient
- Water Treatment Chemical
-
Pharmaceutical Intermediates
Promotion
ECHEMI Mall
Wholesale
Weekly Price
Exhibition
News
-
Trade Service
News from China Petrochemical News “Report, monitor, ball 28# tank bottom leaked liquefied petroleum gas, please come to rescue quickly
.
”
At 9:15 on the morning of June 27, the tank bottom flange of the 28# tank in the Beishan spherical tank area of the Maoming Petrochemical Railway Transportation Division suddenly "leaked" liquefied petroleum gas.
After the out-of-shift operation found out, the explosion-proof walkie-talkie immediately reported to the monitor
.
After receiving the report, the shift leader immediately activated the emergency plan for the leakage of liquefied gas from the spherical tank, notified the dispatcher and the workshop on duty as soon as possible, contacted the relevant unit to stop feeding materials into the tank, and instructed the team member to open the water mist spray and change the ball 28# tank For the fire fighting foam process, shut down all pumps and inlet and outlet valves in operation, evacuate on-site construction personnel, and pull the cordon
.
In less than 5 minutes, the leaders of the oil loading workshop, professional management personnel and the workshop emergency team rushed to the scene to participate in emergency rescue
.
"Report, Director, the danger has not been relieved, and the leak is still expanding
.
"
"Report to the dispatcher immediately, the accident escalates, and ask for support from brother units
.
"
The workshop director who arrived at the scene took over the commander's flag and put on the commander's armband.
After understanding the danger, he issued an accident escalation instruction
.
At 9:25, as the accident further escalated, party and government leaders from the Railway Transport Division, the Oil Refining Division, and the Water Operations Department, as well as professionals from various agencies and offices, rushed to the scene to participate in the rescue
.
At 9:40, after the team, emergency team and personnel of related units, the danger of the leakage of liquefied gas from the flange of the 28# spherical tank was completely relieved
.
"Today's exercise was very successful.
All participating units responded promptly, acted swiftly, and had clear responsibilities.
The entire exercise was orderly and orderly, and achieved the expected results
.
"
"June to July is a two-special and two-sensitive period.
All units and teams must strengthen emergency drills, strive to improve emergency response capabilities, and build a safe production line of defense for the party's centennial birthday
.
"
At the end of the drill, the director of the oil loading workshop, the manager of the railway transportation branch, and the supervision team of the company's safety and environmental protection department successively made comments and put forward opinions and suggestions on the unobvious on-site emergency command settings that were exposed during the drill
(Li Yisong)